3-5
IC-35 MAINTENANCE CHECKLIST
Refer to the component maintenance section of this manual and to the engine operator's
manual for complete instructions.
50 HOUR INTERVAL:
1. 50 hour lubrication as shown on lube schedule.
2. Inspect wire rope thoroughly.
3. Inspect for physical damage and leaks.
4. Check tire pressure and condition (145
PSI
(1000 kPa)).
5. Clean radiator fins.
6. Change engine oil and filter after first 50 hours and at 250 hours thereafter.
7. Change the hydraulic filters after the first 100 hours and at 500 hours thereafter.
8. Check rotation gear and pinion fit and gear train backlash.
9. Check rotation bearing and gearbox bolt tightness.
10. Check axle mounting bolts and pins.
11. Torque wheel mounting nuts. (60 ft-lbs (80 N-m) front, 200 ft-lbs (270 N-m) rear)
12. Check for loose pins or pin retainers.
13. Check steering lines for damage.
14. Inspect sheaves and hooks for damage or excessive wear.
15. Perform a load test according to the Rated Capacity Limiter User Manual.
16. Check operation of outrigger warning light as described on page 2-9.
17. Clean air cleaner inlet, dustcap, and dust cup.
250 HOUR INTERVAL:
1. 50 hour maintenance.
2. 50 and 250 hour lubrication.
3. Change engine oil and filter.
4. Check tension of fan and alternator belts.
5. Clean battery.
6. Inspect all bolts for tightness.
7. Visually inspect all welds for cracks.
8. Clean or change air filter (every 100 hours if used in dusty conditions).
9. Check hydraulic fittings for leaks.
10. Inspect air intake system for cracks and leaks.
500 HOUR INTERVAL:
1. 50 and 250 hour maintenance.
2. 50, 250 and 500 hour lubrication.
3. Change fuel filter element.
4. Check antifreeze for protection level and cleanliness.
5. Inspect engine fan and belt.
6. Clean crankcase vent.
7. Adjust engine valve clearance per engine manual after first 500 hours and at
1000 hours thereafter.
8. Change hydraulic filter elements and inspect oil from elements for water or
excessive contamination.
9. Check condition of all operational and warning placards.
10. Torque mounting bolts on rotation bearing and gearbox, winch, and axles.
11. Inspect boom sections for signs of overload, excessive wear, or other damage.
12. Replace air filter element.
13. Bleed brakes per page 3-2
5
.
Summary of Contents for IC-35-2G
Page 6: ...1 2 DIMENSIONS AND ORIENTATION IC 35 2G...
Page 7: ...1 3 TURNING DIMENSIONS...
Page 16: ......
Page 29: ...2 13 CRANE CAPACITY CHART FOR IC 35 2G...
Page 30: ...2 14 CRANE CAPACITY CHART FOR IC 35 2G METRIC...
Page 38: ......
Page 47: ...3 9 IC 35 LUBRICATION CHART...
Page 51: ...3 13 JIC SCHEMATIC...
Page 52: ...3 14 JIC SCHEMATIC METRIC...
Page 54: ...3 16 STEERING SYSTEM...
Page 56: ...3 18 IC 35 PROPULSION SYSTEM...
Page 70: ......
Page 71: ......