
3-5
IC-35 MAINTENANCE CHECKLIST
Refer to the component maintenance section of this manual and to the engine operator's
manual for complete instructions.
50 HOUR INTERVAL:
1. 50 hour lubrication as shown on lube schedule.
2. Inspect wire rope thoroughly.
3. Inspect for physical damage and leaks.
4. Check tire pressure and condition (145 psi (1000 kPa)).
5. Clean radiator fins.
6. Change engine oil and filter after first 50 hours and at 250 hours thereafter.
7. Change the hydraulic filters after the first 100 hrs. and at 500 hrs. thereafter.
8. Check rotation gear and pinion fit and gear train backlash.
9. Check rotation bearing and gearbox bolt tightness.
10. Check axle mounting bolts and pins.
11. Torque wheel mounting nuts. (60 ft. lbs. (80 N-m) front, 200 ft. lbs. (270 N-m) rear)
12. Check for loose pins or pin retainers.
13. Check steering lines for damage.
14. Inspect sheaves and hooks for damage or excessive wear.
15. Perform a load test according to the Rated Capacity Limiter User Manual.
16. Check operation of outrigger warning light as described on page 2-9.
250 HOUR INTERVAL:
1. 50 hour maintenance.
2. 50 and 250 hour lubrication.
3. Change engine oil and filter.
4. Check tension of fan and alternator belts.
5. Clean battery.
6. Inspect all bolts for tightness.
7. Visually inspect all welds for cracks.
8. Clean or change air filter (every 100 hours if used in dusty conditions).
9. Check hydraulic fittings for leaks.
10. Inspect air intake system for cracks and leaks.
500 HOUR INTERVAL:
1. 50 and 250 hour maintenance.
2. 50, 250 and 500 hour lubrication.
3. Change fuel filter element.
4. Check antifreeze for protection level and cleanliness.
5. Inspect engine fan and belt.
6. Clean crankcase vent.
7. Adjust engine valve clearance per engine manual after first 500 hrs. and at
1000 hrs. thereafter.
8. Change hydraulic filter elements and inspect oil from elements for water or
excessive
contamination.
9. Check condition of all operational and warning placards.
10. Torque mounting bolts on rotation bearing and gearbox, winch and axles.
11. Inspect boom sections for signs of overload, excessive wear, or other damage.
12. Replace air filter element.
13. Bleed brakes per pg. 3-23
Summary of Contents for IC-35-2F
Page 7: ...1 2 DIMENSIONS AND ORIENTATION IC 35 2F Courtesy of Crane Market...
Page 8: ...1 3 TURNING DIMENSIONS Courtesy of Crane Market...
Page 17: ...Courtesy of Crane Market...
Page 29: ...2 12 CRANE CAPACITY CHART FOR IC 35 2F Courtesy of Crane Market...
Page 30: ...2 12M CRANE CAPACITY CHART FOR IC 35 2F METRIC Courtesy of Crane Market...
Page 31: ...Courtesy of Crane Market...
Page 39: ...Courtesy of Crane Market...
Page 47: ...3 8 IC 35 LUBRICATION CHART Courtesy of Crane Market...
Page 51: ...3 12 JIC SCHEMATIC Courtesy of Crane Market...
Page 52: ...3 12M JIC SCHEMATIC METRIC Courtesy of Crane Market...
Page 53: ...Courtesy of Crane Market...
Page 55: ...3 14 STEERING SYSTEM Courtesy of Crane Market...
Page 57: ...3 16 IC 35 PROPULSION SYSTEM Courtesy of Crane Market...
Page 71: ...Powered by TCPDF www tcpdf org Courtesy of Crane Market...