Brocade MLXe Series Hardware Installation Guide
119
53-1003030-01
Installing a Brocade MLXe-32 router
2
•
All cables must be firmly connected, supported, and contained.
•
Use cable cinches, spaced approximately every 24 inches, to secure all of the cables for each
module into a single bundle. This is especially important at the ends nearest the module
connections. Each cable cinch holds up to 8 MRJ21 cables, or 48 RJ45 cables.
•
For additional security, use cable ties to secure cables to the cable management system
hardware on the sides of the unit.
•
The cable routing slots at the top and bottom of the unit are strong enough to hold many
cables, but the more cable cinches and cable ties you use, the more secure your cable
management system will be.
•
If you bundle the cables correctly, you will be able to move the bundles to the side to access
the modules for service, without disturbing the connections. Refer to
•
Always route the cables for the outer-most modules out the sides of the unit. Route the cables
for the innermost modules through the top or through the bottom cable management hardware
on the unit.
Installing power supplies in a Brocade MLXe-32 router
DANGER
High Touch Current. Earth connection is essential before connecting supply.
Follow these steps to install a power supply in a Brocade MLXe-32 router.
1. Remove the blank power supply faceplate.
2. Remove the power supply from the packaging.
3. Insert the power supply into the slot, using the guides on each side of the slot. Refer to