90
Brocade MLXe Series Hardware Installation Guide
53-1003030-01
Installing a Brocade MLXe-32 router
2
5. Slide the router onto the lift plate.
DANGER
Four or more people are required to position the unpopulated router into the rack.
DANGER
Do not use the handles on the power supply units or fan modules to position the router.
6. Secure the router to the mechanical lift with a strap to prevent tipping.
7. Carefully position the router in front of the rack where it is to be installed.
NOTE
Make sure your site provides 200-240V power.
Installing your 32-slot device in a 2-post rack or open cabinet
NOTE
Because of the weight of a fully-populated 32-slot chassis, it is not recommended that you install
your 32-slot router in a 2-post rack or open cabinet. The preferred installation is in a 4-post rack or
open cabinet. Refer to
“Installing your 32-slot router in a 4-post rack or open cabinet”
for installation instructions
You can install your 32-slot device in a 2-post rack or open cabinet in either a front-mount
configuration or a mid-mount configuration using the factory-installed mounting brackets. For a
mid-mount configuration, simply remove the factory-installed mounting brackets from the front
edges of the device and re-attach them to the center sides of the device using the pre-drilled holes.
Once you have completed the preliminary installation preparations (refer to
on page 89), complete the following steps to install your router in a 2-post
rack or cabinet.
1. Unpack the Open Frame EIA 310-D Rack Mount Kit. Refer to
and
for a list
and illustration of the kit components.
lists the items that are included in your Open Frame EIA 310-D Rack Mount Kit.
ATTENTION
Use the screws specified for the type of rack. Make sure you have the items listed above and shown
in
TABLE 24
Open Frame EIA 310-D Rack Mount Kit contents
Part Number
Description
Quantity
42-1000452-01
Saddle
1
52-0000211-01
10-32 x 5/8 inch screws
14
52-1000141-01
12-24 x 1/2 inch screws
14
52-1000138-01
M6 x 12 mm screws
14