![Brink Air Comfort Installation Regulations Download Page 23](http://html.mh-extra.com/html/brink/air-comfort/air-comfort_installation-regulations_2812493023.webp)
Place the Renovent Excellent 3/1 on top of the Air Comfort:
1. Remove the break-off section (2) and the break-off section (3) from the top plate of the Air Comfort.
2. Remove the insulation that is released.
3. Stick the 4 black buffers from the siphon set onto the indentation (1) of the top plate of the Air Comfort.
4. Stick the sealing tape of the siphon set over the edge of the break-off openings (2, 3).
5. Place the Renovent Excellent on the Air Comfort in such a way that the protective covers are located at the
front in 1 section.
5.3 Water connections
5.3.1 Heat exchanger
Connect the heat exchanger with 22 mm fittings:
1. Loosen the two screws between the protective cover and the filter door.
2. Slide the protective cover to the side and remove it from the appliance.
3. Advice: Install a shut-off valve with coupling in the supply and discharge pipes. Ensure that these shut-off
valves are installed directly on the outside of the appliance.
Use a clamp connection to connect the supply and discharge pipes to the heat exchanger.
1. If the Air Comfort is installed also on the cooling side, all water connections must have damp-proof insulation.
When applying a clamp connection always use a support bush Ø 22 mm, see picture.
1
2
3
1. Air Comfort appliance
2. Support bush
3. Water connection (by fitter)
5.3.2 Condensation discharge
The condensation discharge is used for cooling and when a heat recovery unit is installed on the Air Comfort.
5.3.2.1 Condensation discharge Air Comfort for cooling
Connect the condensation discharge:
1. Loosen the two screws between the protective cover and the filter door.
2. Slide the protective cover to the side and remove it from the appliance.
3. Connect the condensation discharge pipe with 15 mm fittings:
Use an open connection for the condensation discharge.
Air Comfort 614788-B
Brink / 23