
Bridgeview Manufacturing Inc.
Page 36
Gearbox and Flail Replacement Procedure
Flail replacement is accomplished by removing the 3/4”x 4-
3/4” bolt holding the flail to the rotor. The flail is then lifted away
from the rotor. The bushing can now be removed by using slight
pressure to push it out of the flail. Inspect the bolt, bushing, and the
flail for wear. If wear is excessive, replace with new parts.
Bridgeview Manufacturing Inc. recommends when changing
flails to change
in
PAIRS
(opposite each other). Processing bales
with broken flails causes the rotor to be out of balance and excessive
vibration may cause machine deterioration.
If a new rotor is required, care must be taken when reinstalling:
-
Clean the spline and shaft ends of the rotor of any debris
-
Clean the inside of the gearbox. Check the splines for damage.
-
Slide front twine guard over the rotor
-
Install new rotor bearing (if necessary). Apply
loc-tite
to bolts and torque to
110 ft-lb
-
Slide the rotor through the rear tub hole. Then push the spline end through the front tub
panel.
-
Install rear bearing plate and bearing over the rotor shaft. Do not tighten collar yet.
-
Install the gearbox over the rotor spline and bolt to the tub
-
Check flail clearance of
1/2 to 5/8”
to tub panel
-
Center the rotor in the tub so that the flails are centered between the hoops and slots
-
Tighten bearing lock collar
counter-clockwise
. Apply
loc-tite
to the set screw and torque
to
100 in-lb
.
-
Check gearbox oil. Drain and replace if necessary.
-
Add
80 pumps
of grease to the front gearbox grease zerk.
-
Install front twine guard using 3/8” bolts.
Summary of Contents for BALE KING 7400
Page 4: ...Bridgeview Manufacturing Inc Page iv ...
Page 57: ...Bridgeview Manufacturing Inc Page 53 Chain Table Overview See reference table page 52 ...
Page 58: ...Bridgeview Manufacturing Inc Page 54 Chain Slat Assembly See reference table page 52 ...
Page 59: ...Bridgeview Manufacturing Inc Page 55 Chain Slat Front Panel See reference table page 52 ...
Page 60: ...Bridgeview Manufacturing Inc Page 56 Chain Slat Rear Panel See reference table page 52 ...
Page 61: ...Bridgeview Manufacturing Inc Page 57 Chain Slat Access Panel See reference table page 52 ...
Page 63: ...Bridgeview Manufacturing Inc Page 59 Hoop Grates See reference table page 58 ...
Page 64: ...Bridgeview Manufacturing Inc Page 60 Adjustment Handles See reference table page 58 ...
Page 65: ...Bridgeview Manufacturing Inc Page 61 ...
Page 66: ...Bridgeview Manufacturing Inc Page 62 Lower Tub Components ...
Page 70: ...Bridgeview Manufacturing Inc Page 66 Deflector ...
Page 72: ...Bridgeview Manufacturing Inc Page 68 Upper Tub Components ...
Page 74: ...Bridgeview Manufacturing Inc Page 70 Front Tub Components ...
Page 77: ...Bridgeview Manufacturing Inc Page 73 ...
Page 79: ...Bridgeview Manufacturing Inc Page 75 Diverter Control Box 24466 ...
Page 86: ...Bridgeview Manufacturing Inc Page 82 Three Bale Kit Left Arm See reference table page 81 ...
Page 87: ...Bridgeview Manufacturing Inc Page 83 Three Bale Kit Right Arm See reference table page 81 ...
Page 88: ...Bridgeview Manufacturing Inc Page 84 Three Bale Kit Center See reference table page 81 ...
Page 94: ...Bridgeview Manufacturing Inc Page 90 Front Panel Chain Motor ...
Page 95: ...Bridgeview Manufacturing Inc Page 91 Front Panel 7400 3 Remote ...
Page 96: ...Bridgeview Manufacturing Inc Page 92 Front Panel 7400 2 Remote ...
Page 97: ...Bridgeview Manufacturing Inc Page 93 Front Panel 7400X 4 Remote ...
Page 98: ...Bridgeview Manufacturing Inc Page 94 Front Panel 7400X 3 Remote ...
Page 99: ...Bridgeview Manufacturing Inc Page 95 Front Panel 7400X 2 Remote ...
Page 100: ...Bridgeview Manufacturing Inc Page 96 Rear Fork ...
Page 101: ...Bridgeview Manufacturing Inc Page 97 Rear Fork Three Bale Kit ...