8.2 INSPECTION PROCEDURE 
 (1) Daily inspection

 (carried out by operating staff or competent person) 

Part 

Inspection method 

Limit / criterion for  

putting-out of 

operation 

Remedy 

1. Jack function 

Visually, 
aurally 

The jack goes 
hardly, stammers, 
emits noise etc. 

To clean up and 
grease the jack. If 
the defect will not 
be removed, get the 
jack repaired. 

2. Pawls function 

Visual inspection 
when jacking up 

Pawls do not snap 
behind dents of the 
ratchet. 

To clean up, 
grease, eventually 
change the spring. 

3. Fixative parts 
 
 

Visual inspection of 
all screws, nuts, 
rivets etc. 

Faulty or missing 
parts; 
 
Released parts 

Replace by new 
ones; 
 
To retighten 
released parts 

 

(2) Regular inspection

 (carried out by competent person) 

Part 

Inspection 

method

 

Limit / criterion for 

putting-out of 

operation

 

Remedy

 

1. Fixative parts 
 
 

Visual inspection 
of all screws, nuts, 
rivets etc. 

Faulty or missing 
parts; 
 
Released parts 

Replace by new 
ones; 
 
To retighten 
released parts 

2. All parts 

Visual inspection 

Outworn or 
damaged parts; 
 
Fouled and 
ungreased parts 
 

Replace by new 
ones; 
 
To take to parts, 
clean up, grease 
and again assemble 

3. Label – marking of 
load capacity on the 
jack 

Visual inspection 

Load capacity is not 
readable 

To repair or replace 
by new one 

4. Brake 

Jack up and lower 
the part of the 
equipment  

When interrupting 
jacking up the brake 
must hold firmly the 
load in each 
position during 
raising and lowering 

If it will not be so, 
ask for repair and 
adjusting of the 
brake 
 

 
 
 

Summary of Contents for 15-00-CON

Page 1: ...load capacity 10t CONTAINER WALL MOUNTED CONSTRUCTION CON W CONTAINER DESIGN CON these versions are further available in variants DESIGN WITH RATCHET CRANK RK DESIGN WITH RATCHET HANDLE LEVER RKP DES...

Page 2: ...N 10 7 2 SAFETY WORK ENVIRONMENT 10 8 JACK CHECK 11 8 1 INSPECTION 11 8 1 1 Inspections types 11 8 1 2 Daily inspection 11 8 1 3 Regular inspection 11 8 1 4 Jack occasionally used 11 8 1 5 Report on i...

Page 3: ...plant etc The weight of a movable part of a structure when handling does not have to exceed specified permitted load capacity of the jack 2 2 The jack by its design meets requirements provided by Dir...

Page 4: ...nsure the jack would be operated by physically fit qualified and instructed persons older than 18 years familiarized with the operation manual and trained in security of work and mode of operation ALW...

Page 5: ...the approval of the producer 4 PACKING STORAGE AND HANDLING 4 1 PACKING 4 1 1 Jacks are supplied in assembled state in bulk in transport cases 4 1 2 The following accompanying documentation is a part...

Page 6: ...0 C to 500 C 12 8 15 2 17 0 15 00 CON 11 4 13 8 15 6 15 00 CON W 5 360 850 550 22 1 25 6 28 5 15 00 CON 19 0 22 5 25 4 15 01 CON W 10 345 825 540 35 40 45 15 01 CON 33 38 43 Dimensions Type design Loa...

Page 7: ...he load diagram Tab 5 1 MECHANICAL CLASSIFICATION Load diagram load distribution Definition Load coefficient Average daily operating time h 1 light Jacks usually being subject to the low load and only...

Page 8: ...article 6 4 7 EN ISO 80079 36 article 6 7 and SN SN CLC TR 60079 32 1 are not used in the chain block 5 2 4 The jack does not exceed the noise values specified in the Annex No 1 article 1 7 4 2 lette...

Page 9: ...bar ends with 25 mm 2 5t load capacity or 30 mm 5t 10t load capacity serve for mounting to a structure 6 1 2 Product design CON The manufacturer of the equipment in which the jack will be used specifi...

Page 10: ...nt that there is the symbol of the protection type marked on the label see articles 2 3 2 4 and 5 3 of this OM 7 1 2 The jack is operated by a crank Jacking up and lowering of a structure can be inter...

Page 11: ...inspection also during operation in the interval between regular inspections Qualified employees will determine whether any defect or damage can constitute a hazard and whether the detailed inspectio...

Page 12: ...o retighten released parts 2 Regular inspection carried out by competent person Part Inspection method Limit criterion for putting out of operation Remedy 1 Fixative parts Visual inspection of all scr...

Page 13: ...grease solvent and apply new grease Use grease specified by the producer Lifters of load capacity 2 5 5 a 10t are equipped with a lubrication plug on the cover of the gear transfer We recommend regula...

Page 14: ...mark disabled or repaired jack with appropriate inscription i e OUT OF OPERATION NEVER carry out maintenance if there is a load on the jack NEVER work with the jack that is under repair ALWAYS when r...

Page 15: ...orm maintenance in clean environment 2 NEVER disassemble the jack more than it is necessary to carrying out the needful repair 3 NEVER use excessive power when dismantling parts 4 NEVER use heat fire...