System User Guide Rev. 1.6 VectorVision
71
VECTORVISION SKY NAVIGATION STATION
5.5.2
Turning On
How to Turn On
Waiting Period
If system has been turned off, wait at least 15 seconds before turning it on again. Oth-
erwise, high input current may trip the circuit breaker.
Abnormal Impacts
Do not use the system after an abnormal impact, such as an earthquake or explosion.
Because of the possibility of fundamental structural damage to the building, a new
structural evaluation must be performed.
Steps
1.
Ensure that all cables have been connected.
2.
Open front door of 19” rack.
3.
Turn main switch clockwise to “
I
” position.
4.
Press UPS power on button.
5.
Close front door of 19” rack.
6.
Wait for system to boot.
NOTE: Once operating system has been initialized, the startup screen is opens.
7.
Follow instructions given in the
Software User Guide
.
Summary of Contents for VectorVision
Page 2: ......
Page 14: ...14 System User Guide Rev 1 6 VectorVision Training Documentation...
Page 20: ...20 System User Guide Rev 1 6 VectorVision Malfunctions Return Instructions...
Page 56: ...56 System User Guide Rev 1 6 VectorVision Turning the System On and Off...
Page 84: ...84 System User Guide Rev 1 6 VectorVision Operating the Camera...
Page 94: ...94 System User Guide Rev 1 6 VectorVision Camera Handle Sleeve...
Page 104: ...104 System User Guide Rev 1 6 VectorVision VectorVision Components...
Page 108: ...108 System User Guide Rev 1 6 VectorVision INDEX VectorVision 27...
Page 109: ......