52
System User Guide Rev. 1.6, Planning & Transfer Systems
System Set Up
4.4.5
Exchanging Hotplug Components
Authorization
Only Brainlab support is authorized to exchange hotplug components. In certain cases trained ser-
vice technicians could be authorized by Brainlab to open the system to exchange hotplug compo-
nents.
If you have been authorized by Brainlab to open the system to exchange hotplug com-
ponents, precisely follow the precautions below.
Precautions
• Properly ground the system to prevent damage to electrical components
• Ensure proper grounding before beginning any installation procedure. Improper grounding can
cause electrostatic discharge
• Ensure that you do not use conductive tools that could bridge live parts
• Remove all watches, rings, or loose jewelry when working in hotplug areas of an energized
server and storage products
• Hotplug power supplies are not designed to be removed or installed with AC power connected
to the power supply. To reduce risk of electric shock or damage to equipment when handling
hotplug power supplies:
- Install power supply before connecting power cord to power supply
- Unplug power cord before removing power supply from system
- If system has multiple power sources, unplug all AC power cords from power supplies to
completely disconnect power from system
- Verify that the external power source connected to your system matches the type of power
source indicated on type plate
Summary of Contents for IPLAN NET SERVER
Page 2: ......
Page 6: ...6 System User Guide Rev 1 6 Planning Transfer Systems...
Page 20: ...20 System User Guide Rev 1 6 Planning Transfer Systems Correct Handling...
Page 68: ...68 System User Guide Rev 1 6 Planning Transfer Systems Turning System On Off...
Page 82: ...82 System User Guide Rev 1 6 Planning Transfer Systems Compliances iPlan Net Server...
Page 88: ...88 System User Guide Rev 1 6 Planning Transfer Systems iPlan Workstations iPlan Net Server...
Page 91: ......