CAP. 5 - INSTALLATION
MULTIGAS 8500
CAP. 5 - INSTALLATION
5.1
EQUIPMENT INSTALLATION
The order of the following listed steps is the one advised even if the same could be carried
out in a different order.
AT DISTRIBUTOR SITE (INTERNET CONNECTION REQUIRED)
It is advised to lift the carton, connect electricity and switch on the equipment.
1° Contrast adjustment (if needed) and Language selection.
(after this step, the device can already be used to show the software potentials without use of
the gas).
2° Check the software version and reprogram the equipment if needed
3° Registration of the equipment and data of the end customer on the website
www.brainbee.com (distributor reserved area).
Registration may also be postponed to after initial checking and it will be proposed again
when the database is selected, or every time the equipment is switched on. Without
registration, the automatic cycles and the database will not be enabled.
4° Pack the equipment for final transport to the end customer.
AT END CUSTOMER’S SITE
5° Unpack, position the equipment and execute the electrical connections. Unscrew the scale
locking screw and check that the empty containers of new and exhausted oil and tracer have
been inserted.
The altitude compensation procedure shall be executed in case of installation
in a location above 500m a.s.l. (this is aimed at improving the station performance, which
can be affected by atmospheric pressure that changes in relation to altitude). Every time the
station is moved to an altitude other than the one at which the sensor was calibrated or the
initial check was carried out, a new calibration at the altitude of destination is required.
Enter the menu:
Service, using the password “XHIGH”
Altitude – enable the function [when pressure is reset or calibrated, the station will require
setting the altitude range (with 500m intervals) where the station is located].
6° Carry out the first tank filling (including weights and pressure checks) as proposed by the
software according to the following points:
•
Check gas scale zero
•
Check oil scales zero
•
Relative pressure zero setting according to local atmospheric pressure
•
Internal tank filling (with value of at least 3 Kg, 2 Kg minimum)
Initial checking, if passed, enables use of the equipment with gas.
Checking may be interrupted at each of its points, if not completed it will be proposed again
at every following CLIMA machine switch on or in case one attempts to carry out the
recharge operation.
If the check is not passed, it may be necessary to proceed to equipment scales or electronic
pressure gauge calibration; for said operation described as follows, the appropriate Brain
Bee SERVICE KIT is required.
7° New oil and tracer containers filling, the use of Brain Bee WARRANTY LINE consumables
is recommended.
8° Delivery and illustration of the warranty conditions, of the EC declaration of conformity
and use and maintenance manual to the end customer.
9° Optional accessories presentation
10° Working parameters and garage data (end customer) setting
Summary of Contents for multigas 8500
Page 11: ...ENGLISH 11 78 CAP 5 INSTALLATION MULTIGAS 8500...
Page 46: ...ENGLISH 46 78 CAP 9 UPDATE MULTIGAS 8500 Select update device...
Page 53: ...ENGLISH 53 78 CAP 11 REFRIGERANT FLUID CIRCUIT MULTIGAS 8500 RECOVERY...
Page 54: ...ENGLISH 54 78 CAP 11 REFRIGERANT FLUID CIRCUIT MULTIGAS 8500 VACUUM...
Page 55: ...ENGLISH 55 78 CAP 11 REFRIGERANT FLUID CIRCUIT MULTIGAS 8500 OIL TRACER INJECTION...
Page 56: ...ENGLISH 56 78 CAP 11 REFRIGERANT FLUID CIRCUIT MULTIGAS 8500 RECHARGE...
Page 57: ...ENGLISH 57 78 CAP 11 REFRIGERANT FLUID CIRCUIT MULTIGAS 8500 NON CONDENSABLE GASES DISCHARGE...
Page 66: ...ENGLISH 66 78 CAP 14 SPARE PARTS MULTIGAS 8500...