Express® Lavatory System SS-Series
Installation - Obsolete
SS-3/AZ/WH97TAS
5
Bradley Corporation • 215-1175 Rev. H; EN 08-805
4/24/08
Installation Instructions
Step 1: Rough in
Note: See Figure 1 (below), and Figures 1A and 2 (on page 6) when roughing in the Express®.
IMPORTANT: Flush the supply lines before making connections. Debris in supply
lines will cause the valves to malfunction.
IMPORTANT: Dimensions shown in Figure 1 are for Juvenile Height (grades Pre-K
thru 5 or 6) and in Figure 1A for Juvenile Height (grades 6 thru 8 or 9)
IMPORTANT: Turn OFF electrical power to the outlet when installing the Express®.
1. Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown below.
2. Rough in 1-1/2" NPT drain waste connection through wall at dimensions shown below.
3. Install the 110 volt GFCI electrical outlet per local code at the location shown in Figure 2 on page 6.
4. Install (10) 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by installer)
at the locations shown in Figure 1 and 1a on pages 5- 6.
NOTE: The anchors will be used to mount the Express® bowl and frame to the wall.
Step 1: Rough-in continues...
Figure 1
Juvenile Height SS-3/AZ/WH97TAS Express® Lavatory System
(grades Pre-K thru 5 or 6)