background image

Express® Lavatory System SS-Series

Installation - Obsolete

SS-3/AZ/WH97TAS

15

Bradley Corporation • 215-1175 Rev. H; EN 08-805

4/24/08

Check Valve Troubleshooting

If water just dribbles or does not flow from sprayhead:

1. Close the stops and check the valves that supply water to the lavatory system. 

2 Inspect the stop/check valves for proper installation.

3. Remove the flexible hoses from the stop/check valves and clean the strainers, if necessary.

If water sprayhead delivers all hot or cold water:

1. Close the stops and check the valves that supply water to the lavatory system.

2. Inspect the stop/check valves for proper installation.

3. Remove the flexible hoses from the stop/check valves and clean the strainers, if necessary.

4. Inspect mixing valve for proper installation (see Vernatherm valve on page 17).

•  A red marking indicates the hot inlet.

Solenoid Valve Troubleshooting

CAUTION:

Turn off electrical and water supplies to unit before troubleshooting.

Problem: 

An individual operating station fails to shut off and drips.

Cause: 

There is debris trapped between the diaphragm and the valve seat.

Solution:

Remove debris between diaphragm and the valve seat.

1. Using a small wrench, loosen the bonnet nut, unscrewing counterclockwise, and gently tip for-

ward to remove from the valve body. Be careful not to lose the armature or spring.

2. Remove the diaphragm. Remove any particles that have been trapped between the diaphragm

and the valve seat. Rinse off the diaphragm and inspect for damage. Make sure both orifices are
open.

3. Reassemble in reverse order. Do not overtighten the bonnet nut or you may crack the plastic

valve body. Hand tight plus 1/8 turn is sufficient.

4. Reconnect the wiring per diagram on page 10.

Problem: 

An individual operating station fails to turn on.

Cause: 

A failed coil for the valve, or loose electrical connection to the terminal.

Solution:

Test the station to determine cause.

1. Disconnect the wires from the coil (269-579) of an adjacent valve. Disconnect the wires from

the problem valve and reconnect to the adjacent valve.

2. Turn on electrical and water supplies to the unit. Pass your hand in front of the sensor of the

problem station, and the adjacent station should operate.  

If the adjacent station operates and cycles normally, replace the coil on the problem valve.

If the adjacent valve fails to turn on, inspect the wires from the sensor cable and do the following:

• make sure there are no breaks and that the fully insulated disconnect terminals are firmly

crimped in place;

• turn off electrical and water supplies;
• reconnect to the adjacent valve and turn on electrical and water supplies to the unit;
• pass your hand in front of the sensor. If the station still fails to turn on, replace the sensor 

(see page 14).

Summary of Contents for Express SS Series

Page 1: ...52 0309 TEL 1 800 BRADLEY FAX 262 251 5817 http www bradleycorp com Table of Contents Pre Installation Information 2 Dimensions 3 4 Installation Instructions 5 10 Wiring Diagram 10 Cleaning and Maintenance 11 Soap Dispenser Maintenance 2 13 Assembly of Components 3 14 Check Valve Troublshooting 15 Solenoid Valve Troubleshooting 5 16 Vernatherm Mixing Valve 17 SS 3 AZ WH97TAS Express Lavatory Syste...

Page 2: ...es and ordinances for compliance Infrared sensor and solenoid Each sprayhead is controlled by a separate sensor and solenoid valve enabling each user to activate a single flow of water Each valve uses less than half the maximum of hot water allowed by the ANSI ASHRAE IES 90A 1980 Standard Supplies required for installation 10 3 8 wall anchors bolts and washers to mount frame and bowl to wall minim...

Page 3: ...Express Lavatory System SS Series Installation Obsolete SS 3 AZ WH97TAS 3 Bradley Corporation 215 1175 Rev H EN 08 805 4 24 08 SS 3 AZ WH97TAS Express Lavatory System Dimensions ...

Page 4: ...eries SS 3 AZ WH97TAS Installation Obsolete 4 4 24 08 Bradley Corporation 215 1175 Rev H EN 08 805 Dimensions continued Juvenile Height SS 3 AZ WH97TAS Grades 6 thru 8 or 9 Juvenile Height SS 3 AZ WH97TAS Grades Pre K thru 5 or 6 ...

Page 5: ... thru 8 or 9 IMPORTANT Turn OFF electrical power to the outlet when installing the Express 1 Rough in 1 2 NPT hot and cold supply lines through wall at dimensions shown below 2 Rough in 1 1 2 NPT drain waste connection through wall at dimensions shown below 3 Install the 110 volt GFCI electrical outlet per local code at the location shown in Figure 2 on page 6 4 Install 10 3 8 wall anchors with a ...

Page 6: ...vatory System SS Series SS 3 AZ WH97TAS Installation Obsolete 6 4 24 08 Bradley Corporation 215 1175 Rev H EN 08 805 Figure 2 Figure 1a Juvenile Height SS 3 AZ WH97TAS Express Lavatory System grades 6 thru 8 or 9 ...

Page 7: ...ring the frame to a wall that is not flat may cause the frame to bend If necessary install shims to compensate for wall distortion 3 Ensure that the back of the frame is flat against the wall If wall is not flat insert shims behind the frame to ensure that it will not bend when anchored 4 Once you have positioned the frame such that it is level and flat against the wall or shimmed use the 3 8 bolt...

Page 8: ... 2 Attach the front of the bowl assembly to the frame using the four 1 4 20 x 3 8 pan head screws and washers provided Do not tighten screws at this time IMPORTANT When bolting the bowl assembly to the frame and wall do not overtight en the bolts Overtightening bolts can damage the Terreon material 3 After the bowl assembly is attached to the frame use two 3 8 bolts and washers supplied by the ins...

Page 9: ...e 3 8 tube from the sprayhead to the 90 elbow located on the stop check strainer see Figure 6b 2 Insert the plastic tubing from the bowl assembly into the Vernatherm Mixing Valve 3 Assemble the P trap supplied and make drain connections IMPORTANT The Express must be connected to the 24 VAC Class II plug in transformer provided Connection to 110 VAC can result in damage to the electronics and cause...

Page 10: ...of each station s sensor until all the air is purged from the lines and water is flowing smoothly 3 After testing is complete reinstall panel to frame Fasten panel with the ten Torx head screws provided see Figure 3 on page 7 4 START UP NOTE This unit is equipped with adaptive infrared control It may take up to eight minutes to properly adjust to the environment when power is turned on or if power...

Page 11: ...ll not burn a lit cigarette in contact with Terreon could leave a scorch mark Scorch marks can be removed by buffing with a 7448 Scotch Brite pad or with an abrasive cleaner Repair kit In the unlikely event your Terreon surface becomes damaged it can easily and expensively be repaired Contact your Bradley representative to order a repair kit and be sure to specify color when ordering Panel cleanin...

Page 12: ... sprayhead see Figure 7a 2 To remove packing dust rinse out each soap tank with hot water Shake water out thoroughly and allow to dry 3 Pour the soap into each soap tank s filler hole see Figure 7b 4 After each soap tank is filled position the soap tanks into the sprayhead openings and push into place Step 2 Change soap type 1 Pour out all of the soap from the dispenser 2 Rinse the soap dispenser ...

Page 13: ...Inspect the interior of the soap tank for residue or coagulation of soap If necessary clean the soap tank according to the following procedure 1 Pour out any remaining soap in the tank 2 Fill the tank half full of hot water and shake the tank to dislodge the soap residue 3 Empty the water from the container and repeat steps 1 and 2 until the soap container is clean NOTE If rinsing alone does not r...

Page 14: ...e the twelve Phillips head screws located in the bottom of the sprayhead body and lift the cover shelf off To reinstall sprayhead cover shelf Position the cover shelf on the sprayhead body and secure it to the sprayhead body using the twelve screws provided Drain Assembly Vernatherm Thermostatic Mixing Valve Assembly S67 571 FLEX HOSE WITH SWIVEL END 269 653 STOP CHECK VALVE S27 102 FILTER WASHER ...

Page 15: ...om the valve body Be careful not to lose the armature or spring 2 Remove the diaphragm Remove any particles that have been trapped between the diaphragm and the valve seat Rinse off the diaphragm and inspect for damage Make sure both orifices are open 3 Reassemble in reverse order Do not overtighten the bonnet nut or you may crack the plastic valve body Hand tight plus 1 8 turn is sufficient 4 Rec...

Page 16: ...Express Lavatory System SS Series SS 3 AZ WH97TAS Installation Obsolete 16 4 24 08 Bradley Corporation 215 1175 Rev H EN 08 805 Figure 12 ...

Page 17: ...with a new ring NOTE An old or worn flip ring may cause temperature fluctuation and or water chatter 3 Reassemble the power element and valve body Apply grease to the main valve slide and gently ease into position rotating so that grease is applied to the flip ring Do not force the slide as this may push the flip ring from its position To test rotate the slide a slight drag should be felt when cor...

Reviews: