82
5
Installation and Operating Instructions
5.3 Soft Docking
Installation of Sensor onto Rear Bumper
Drill a hole of 35 mm, pass the sensor lead through with the
7 pin ASS2 connector from the sensor. Fix the sensor with four
fi xing screws onto the rear bumper (Fig. 145). Plug the cable
into the connector from the Soft Docking junction box.
Note:
The sensor is ineffective when the load is longer than the trailer,
or the trailer/container overhangs the sensor, as it can only
measure the distance between the sensor and the loading bay.
(Example: skeleton trailer for long containers ie. 45 ft)
Installation of Power Supply into an existing
Junction Box: (None Aspöck)
Cut the connector off the end of the power cable. Insert cable
through spare entry of existing junction box. Connect wires
as appropriate. Ensure waterproof installation.
Contact allocation:
black – tail light left
grey –
reverse
light
brown – tail light right
white – earth
connection
Close the junction box.
Important!
Ensure the junction box gasket is seated correctly.
Fig. 145
Sensor on rear bumper
60 mm
Ø 10 mm
84.5 mm - Ø 10 mm
Installation of Power Supply with an Adapter
Cable
Disconnect the connector between main cable and the rear
junction box cable.
Plug the adapter for the power supply between these two
connectors (main cable and rear junction cable) (Fig. 146).
Connection to ECO Tronic EBS
Plug the Auxiliary Cable into the AUX ports 4 or 5 in the EBS
Modulator (Fig. 147).
Soft Docking has to be enabled using the Trailer Manager
software.
Fig. 147
Connection to the Modulator
Fig. 146
Installation with an adapter cable
Main cable
Rear junction box cable
Summary of Contents for ECO Tronic EBS
Page 2: ...2 BPW Operating and Installation Instructions...
Page 47: ...47...
Page 90: ...90...
Page 98: ...98 Notice...
Page 99: ...99...