![Bowket HL-A04 Operation Manual Download Page 6](http://html.mh-extra.com/html/bowket/hl-a04/hl-a04_operation-manual_2798033006.webp)
Shenzhen Bowei tech Co.ltd.
ADD:RM902;ShangMei Times;NO.57;LongGuan RD;Long Hua Dist Shenzhen, China;518000
Tel:86-755-29994192 13148703639
Email:[email protected] http://www.bowei-ch.com/
heat absorption‟ principle in medical field.
Installation:
a. Open the package when receiving the machine, place the device on the
level ground. (If
there‟s water on the surface of the device, please wait till dry
then input water to test.).
Keep 22
℃
-28
℃
temperature and the humidity not more than 20% in the
treatment room.
b. Input water ( water source: pure water or distilled water):
a) Screw off the screw caps of water inlet and spilt water orifice at the same
time
b) Connect the water tube and water funnel well and insert the orifice to input
water;
c) Automatic water spilt from the spilt water hole, means enough water input:
Caution: After inputting the water, do not tighten the two screw caps.
Change the water inside of the machine every 1month or 3 months.