14
How to Use Your Preacher Curl
Active pulleys are on the squat station and center cross bar.
(Bowflex Xtreme
®
SE model shown)
Pulley Position and Cable Routing
When using the Preacher Curl attachment, attach the cables to the squat pulley cables. The squat
pullleys are placed in the #1 position (closest to the Power Rod
®
unit).
Refer to the illustration below for proper cable routing.