10
4. Foundation
703871-22-0
Ceiling borehole 20 mm (3/4 inch) ø for through-bolts, length
H
depending on thickness of ceiling.
Support if necessary.
4.2
Anchoring
Correct anchoring is very important for low-noise, fault-free
operation. For installation on foundation it is preferable to
use stone bolts!
Seating must be horizontal and level. Do not place machine
directly on tiles, felt, bituminous coatings, rubber or cork.
With uneven concrete floors it is necessary to level the
machine with wedges and fill the spaces with level course
(epoxy resins).
4.3
Noise or vibration insulation
For special vibration insulation special foundations,
dampers etc. can be used in collaboration with building and
insulation specialists.