![Boston Whaler 25 Guardian Series Operation & Maintenance Manual Download Page 98](http://html.mh-extra.com/html/boston-whaler/25-guardian-series/25-guardian-series_operation-and-maintenance-manual_2796194098.webp)
5-6
Section 5
Battery Systems
Bonding
Your boat’s bonding system starts with a bronze plate
located below the water line at the center of the tran-
som. A #8 awg green cable connects the bronze plate
to the bonding buss system. The fuel tank, fuel fill,
engine crash rail, hand rails, engine bracket, and tow
post are also connected to the bonding buss system
with #8 awg green cables.
Also directly connected to the bonding system are any
shielded cables from certain sensitive electronic
devices. This helps mitigate radio frequency interfer-
ence (RFI) generated by various electrical systems.
The negative buss system and the bonding buss sys-
tem are also connected to each other to reduce the
possibility of a voltage challenge between the two sys-
tems.
Note: All bonding wires and cables are
green
.
Summary of Contents for 25 Guardian Series
Page 18: ...1 10 Section 1 Safety Deck Occupancy Chart ...
Page 20: ...1 12 Section 1 Safety Warning Label Chart 1 3 4 5 6 7 8 9 6 0 A D E H C F G 2 B ...
Page 22: ...1 14 Operator Notes ...
Page 52: ...2 30 Operator Notes ...
Page 56: ...3 4 Section 3 Fuel Systems Fuel System Diagram 1 2 3 5 7 9 A C 0 B 4 6 8 ...
Page 68: ...3 16 Operator Notes ...
Page 70: ...4 2 Section 4 Boat Systems Control Console Layout 1 0 2 4 6 8 9 3 5 7 A B D F H J K C E G I L ...
Page 92: ...4 24 Operator Notes ...
Page 99: ...5 7 Operator Notes ...
Page 120: ...6 12 Section 6 Boat Maintenance Trailer Setup ...
Page 132: ...6 24 Operator Notes ...