7. Reconnect the wire harness and the
antenna and be careful not to pinch any
wires or cables.
8. Slide the unit into the sleeve until it
locks into place.
9. To further secure the unit, use the
supplied metal strap to secure the back
of the unit in place. Use the supplied
hardware (Hex Nut (M5mm) and Spring
Washer) to attach one end of the strap to
the mounting bolt on the back of the unit.
If necessary, bend the metal strap to fit
your vehicle's mounting area. Then use
the appropriate slots at the middle left
and right sides of the unit. Then slide the
sleeve off the back of the unit.
6. Mount the sleeve by inserting it into the
opening of the dashboard and bend open
the tabs located around the sleeve with a
screwdriver. Not all tabs will be able to
make contact, so examine which ones
will be most effective. Bending open the
appropriate tabs behind the dashboard to
secure the sleeve in place.
1. DIN Front-Mount (Method A)
Remove Transit Screws Before
Installation
Before installing the unit, please
remove the two screws.
Installing the unit
Be sure you test all connections first,
and then follow these steps to install the
unit.
1. Make sure the ignition is turned off,
and then disconnect the cable from the
vehicle battery's negative (-) terminal.
5. The two supplied keys release tabs
inside the unit's sleeve so you can
remove it. Insert the keys as far as they
will go (with the notches facing up) into
2. Disconnect the wire harness and the
antenna.
3. Press the
button (7) on the front
panel and remove the control panel (For
details, refer to 'Using the Detachable
Front Panel').
4. Lift the top of the outer trim ring, then
pull it out to remove it.
REL
Installation Opening
This unit can be installed in any
dashboard having an opening as shown
below:
Take out screws
before installation.
BV4450T User’s Manual - page 4