4
Tel.: + 49 / 07621 / 95 93 0
Fax: + 49 / 07621 / 55 184
[email protected]
www.boschert.de
Mattenstrasse 1
79541 Lörrach-Hauingen
BOSCHERT
Version: 05 / 2011
Changes reserved
List of contents
5.13.1 Limit switch Y-axis ..........................................................................................59
5.13.2 Limit switch X-axis ...........................................................................................60
5.13.3 Limit switch tilting table ..................................................................................61
5.13.4 Limit switch clamp ..........................................................................................61
5.14
Limit stops axes .............................................................................................62
5.15
Sprayer ...........................................................................................................63
5.15.1 Spray assembly ..............................................................................................63
6
Setup of the machine ............................................................... 64
6.1
General information........................................................................................64
6.2
The operator´s control on the machine .........................................................64
6.2.1
The operator´s control on the control cabinet ..............................................64
6.2.2
The operator´s controls on the control desk .................................................65
6.2.3
The foot pedal for the hydraulic material clamping .......................................65
6.3
Preparation of the machine for punching ......................................................66
6.3.1
Providing a punching tool ..............................................................................66
6.3.2
Insert the die ..................................................................................................66
6.3.3
Installation of AMADA - Station ......................................................................67
6.4
Preparation of the machine for cutting ..........................................................68
6.4.1
Providing a cutting tool ..................................................................................68
6.4.2
Insert the die ..................................................................................................68
6.4.3
Insert the cutting punch .................................................................................68
6.5
Insert the CU-flat ............................................................................................69
6.6
Starting the machine ......................................................................................70
6.7
Stopping the machine ....................................................................................71
6.8
Restarting the machine ..................................................................................71
7
Maintenance ............................................................................. 72
7.1
Maintenance and inspection ..........................................................................72
7.1.1
General information........................................................................................72
7.2
Maintenance and inspection list ....................................................................73
7.3
Cleaning the machine ....................................................................................74
7.3.1
Auxiliary agents and their use ........................................................................74
7.4
Lubrication......................................................................................................75
7.4.1
Lubrication points ...........................................................................................76
7.4.1.1 Lubrication points X-axis ................................................................................77
7.4.1.2 Lubrication points Y - axis ..............................................................................77
7.4.1.3 Lubrication points punch head ......................................................................78
7.4.1.4 Lubrication point tool box ..............................................................................79
7.4.1.5 Lubrication points clamp ...............................................................................79
7.5
Corrosion prevention .....................................................................................80
7.5.1
Notes on corrosion prevention agents, oils and lubricants ...........................80
7.5.2
Disposal of corrosion-preventing agents, oil and lubricants .........................80
8
Hydraulic ................................................................................... 81