
Boiler block assembly
|
19
6 720 648 162 (2011/08)
5.1.4
Inserting the section sealing
B
Unroll the required length of section sealing from the
roll supplied.
B
Peel the backing paper from the sealing rope as you
insert the cord into the packing groove.
B
Insert the flexible sealing rope into the packing groove
starting in the upper boiler hub area, and lightly press
in.
B
Overlap sealing rope 3/4" (20 mm) at the joins and
press in well.
Fig. 9
Inserting the section sealing rope
5.1.5
Knock intermediate section into place
B
Turn the intermediate section around and locate with
the upper and lower boiler hubs on the nipples of the
rear section.
B
Drive the intermediate section onto the rear section
using a wood or a rubber mallet.
Fig. 10 Knock intermediate section into place
1
Wood or rubber mallet
2
Rear section
5.1.6
Boiler section alignment
B
Position the partly assembled block of two boiler
sections.
B
Position a flat board underneath the center section so
that the boiler block is slightly tilted for the
continuing assembly.
Fig. 11 Installing boiler block section
1
Center section
2
Flat board
CAUTION:
System damage from leaking
boiler sections.
B
Never stretch the sealing rope during
application to ensure that the faces
between the boiler sections are sealed
correctly.
B
Carefully insert the sealing rope into the
boiler section packing grooves.
6 720 648 032-09.1T
CAUTION:
Risk of injury from inadequately
secured boiler sections.
B
Secure the boiler block section against
tipping.
6 720 648 032-10.1T
2
1
1
2
6 720 648 032-11.1T