Duration
Duration
Duration
Duration
Notes
Tripple Evacuated
Evacuation Reading (Must be 1.5 Torr or 0.5mb)
Pressure Tested Too
Strength Tested Too
Sbox Installation Condition
Sbox Acces Condition
Power Status
Indoor Unit Installation Condition
Indoor Unit Access
Leak Tested Too
Pre Commissioning Checks
Condenser Installation Condition
Condenser Access Condition