![Bosch BSS250-21-2 Installation And User Manual Download Page 10](http://html.mh-extra.com/html/bosch/bss250-21-2/bss250-21-2_installation-and-user-manual_52808010.webp)
10
16. Replace tiles
17. Make all water connections, fit all valves and components as per the solar layout
diagram contained in these instructions.
18. Note: The panels should be covered fully to prevent the panels heating up to
temperatures that have potential to cause damage or injury during system fill or
commissioning.
FRAME INSTALLATION metal roof (Non Cyclone Area)
Conduct an inspection of the intendant installation position and ensure that the
panels can be fitted in this position prior to commencing any work.
1. Position the lower bracket on the roof ensuring there is sufficient room to fit the panels.
2. Level the panel bracket and fix to the steel roof using roofing screws or rivets, one
fastener per rib is recommended.
3. Weather proof screw heads and rivets with silicone sealant.
4. Unpack panels (where fitted remove protective plastic from the panels)
5. Place panels into position and fit against lower bracket
6. Join the panels together using the brass barrel unions supplied in the panel installation
kit.
7. Slide the upper panel support bracket under the top of the panels then press it flush
against the top of the panels. Mark its position on the roof.