5
8
Installation and Maintenance
Service Manual
2. Malfunction of Blocked Protection of IDU Fan Motor H6
Main detection points:
● SmoothlyIs the control terminal of PG motor connected tightly?
● SmoothlyIs the feedback interface of PG motor connected tightly?
● The fan motor cant operate?
● The motor is broken?
● Detectioncircuit of the mainboard is defined abnormal?
Malfunction diagnosis process:
Start
While power is off stir the blade
with a tool to see whether the
blade rotates smoothly
Check if the connection of PG
motor feedback terminal is firm
Check if the connection of PG
motor control terminal is firm
Turn on the unit again; measure
whether the output voltage on
control terminal for PG motor is
more than 50V within 1 min after
the louvers are opened
Tighten the screw; reassemble the blade, motor
and shaft bearing rubber base sub-assy to make
sure there is no foreign object between them
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
Is malfunction
eliminated
Is malfunction
eliminated
Is malfunction
eliminated
Is malfunction
eliminated
Is the motor started up
Replace PG motor
Replace the mainboard
with the same model
Measure the voltage of this foot to
neutral wire on the mainboard
End
Reinstall the blade
and motor correctly
Insert the control terminal
of PG motor tightly
Summary of Contents for brisa BRS09HPJ1IA
Page 4: ...1 1 Summary Part Technical Information Indoor Unit B2 BRS09 24HPJ1IA...
Page 5: ...2 Technical Information BRS09HPJ1OA BRS12HPJ1OA BRS18HPJ1OA BRS24HPJ1OA Outdoor Unit...
Page 29: ...26 6 1 Remote Controller Introduction of...
Page 30: ...27 Technical Information...
Page 31: ...28...
Page 32: ...29 Technical Information...
Page 89: ...86 Installation and Maintenance...
Page 94: ...91 Installation and Maintenance BRS18HPJ1OA BRS24HPJ1OA Note Take heat pump for example...
Page 95: ...92 Installation and Maintenance...
Page 96: ...93 Installation and Maintenance...
Page 97: ...94 Installation and Maintenance...
Page 98: ...95 Installation and Maintenance...