7
1
Installation and Maintenance
(6) Overload and air exhaust malfunction diagnosis (following AP1 for outdoor unit control board)
Mainly detect:
●Is the PMV connected well or not? Is PMV damaged?
●Is refrigerant leaked?
Fault diagnosis process:
20 minutes after the
complete unit is
powered off
Is the terminal FA for the
electronic expansion valve
connected correctly?
Connect the
wires correctly
Resistances between the first four pins
close to the terminal hole and the fifth
pin are almost the same, less than 100
ohm.
Replace the electronic
expansion valve
If the fault is eliminated?
If the fault is eliminated?
Replace the
control panel
AP1
Coolant leakage, refilling
the coolant
End
N
N
N
Y
Summary of Contents for brisa BRS09HPJ1IA
Page 4: ...1 1 Summary Part Technical Information Indoor Unit B2 BRS09 24HPJ1IA...
Page 5: ...2 Technical Information BRS09HPJ1OA BRS12HPJ1OA BRS18HPJ1OA BRS24HPJ1OA Outdoor Unit...
Page 29: ...26 6 1 Remote Controller Introduction of...
Page 30: ...27 Technical Information...
Page 31: ...28...
Page 32: ...29 Technical Information...
Page 89: ...86 Installation and Maintenance...
Page 94: ...91 Installation and Maintenance BRS18HPJ1OA BRS24HPJ1OA Note Take heat pump for example...
Page 95: ...92 Installation and Maintenance...
Page 96: ...93 Installation and Maintenance...
Page 97: ...94 Installation and Maintenance...
Page 98: ...95 Installation and Maintenance...