6.3 Initial Startup
Startup Requirements
The Converter AHD-CUC has been properly installed and is
equipped will all required connections.
All external devices connected to the Converter AHD-CUC have
also been installed according to technical specifications or
project drawings and are operational.
All required power supplies are available and error-free.
The Converter AHD-CUC and all connected external devices
are not connected to the power supply or have been wired off-
circuit.
1.
Establish the 24 V DC power supply according to technical
specifications or project drawings.
2.
Establish the power supplies for all external devices connected
to the Converter AHD-CUC according to their corresponding
operating instructions.
3.
Test the power supplies.
CAUTION!
Equipment damage from incorrect voltage!
Connecting an incorrect supply voltage can lead to
equipment damage.
Therefore:
– Review all relevant project documents and op-
eration manuals of the devices used and verify
their correct supply voltage and polarity before
connecting them.
4.
Switch on the power supply of the Converter AHD-CUC and
all connected external devices from the corresponding circuit
breakers in the power distribution and the device internal
starting devices according to the corresponding operation
manuals.
5.
Verify the correct startup sequence according to the following
chapter “Operation.”
6.
Log any errors or functional deviations that may occur and
correct errors through proper measures, referring to the errors
described in the chapter titled “Errors.”
7.
You may need to review the installed configuration (see Chap-
ter 7.1) and adjust it to the necessary operating conditions.
Log the final configuration for the project documentation.