BOGE Operating instructions for C 15 series screw compressors
Page 35
Installation
3.5
Commissioning
Changing the rotational direction
–
Interchange two phases (L1, L2 or L3) in the power cable.
Checking compressed
air outlet for tightness
–
Close mains disconnecting device.
–
To conduct the inspection switch on the compressor and check the com-
pressed air outlet for tightness.
–
Switch off compressor.
–
If necessary, have leakages repaired by skilled qualified pesonnel.
–
List up the test results in the commissioning certificate.
Opening the stop valves
Open ball valve on the compressor delivery.
WARNING: Risk of injury!
–
Switch off the compressor using the OFF button.
–
Actuate emergency-stop switch/button.
–
Open mains disconnecting device.
–
Secure mains disconnecting device against unintentional switch-on.
–
Check to ensure that all machine elements are definitely currentless.
–
Cover or block off adjacent energized parts.
WARNING: Risk of injury!
Work on the compressed air system may only be carried out by experienced
and authorized qualified personnel!
Always wear protective clothing and goggles!
Immediately after having switched on the machine the connection of the com-
pressed air outlet must be checked for tightness!
Make sure to observe an appropriate safety distance during the inspection!
WARNING: Risk of injury!
Prior to any maintenance and servicing work take all necessary safety pre-
cautions as described on page 5.