24
GX
Step 7:
Assembly of the Ab Cable
1. Route the steel ball end of the ab cable (88) through the slot in the front upright (3) and attach
two pulleys in the slot (as shown in Fig. A1) by using two bolts (99), four washers (116), four
bushings (77), and two nylon nuts (124).
L
NOTICE
The cable should run from the bottom of the upper pulley in A1 up to the pulley A2.
2. Route the cable over the pulley A2. Assemble pulley A2 to the top frame (2) by using one bolt
(101) and one nylon nut (124).
3. Route the cable under pulley A3. Assemble pulley A3 to a double pulley block (19) by using one
bolt (101) and one nylon nut (124).
4. Route the cable up and over pulley A4. Assemble pulley A4 to the top frame (2) by using one
bolt (100) and one nylon nut (124).
5. Route the cable under pulley A5. Assemble pulley A5 to a double pulley block (19) by using one
bolt (101) and one nylon nut (124).
6. Assemble a pulley A6 to the open end of the adjustable pulley block (18) by using one bolt (101)
and one nylon nut (124).
L
NOTICE
We recommend the third hole from below. This can be adjusted later if needed.
7. Route the cable over top of this pulley and then down to c.
Summary of Contents for Multi Gym GX
Page 2: ...2 GX...
Page 4: ...4 GX...
Page 10: ...10 GX...
Page 13: ...13...
Page 14: ...14 GX...
Page 20: ...20 GX...
Page 23: ...23...
Page 25: ...25...
Page 27: ...27...
Page 30: ...30 GX...
Page 43: ...43 7 3 Exploded Drawing...
Page 48: ...Multi Gym GX...