background image

M051-K50-A136

1

6 STACK MULTI-JUNGLE (SM60)

WITH HIGH & LOW PULLEYS

UNPACKING AND ASSEMBLY INSTRUCTIONS

Summary of Contents for SM60

Page 1: ...M051 K50 A136 1 6 STACK MULTI JUNGLE SM60 WITH HIGH LOW PULLEYS UNPACKING AND ASSEMBLY INSTRUCTIONS...

Page 2: ...E AND HEAVY USE CAUTION WHEN ASSEMBLING THIS MACHINE MATERIALS AND TOOLS REQUIRED FOR ASSEMBLY 1 2 3 8 5 8 9 16 Socket wrench with extension 1 8 hex key wrench 5 8 9 16 Combination wrench Pinch bar Yo...

Page 3: ...per 2 Remove the parts boxes and shipping boards 3 Remove the items in the parts boxes These items are shown in Figure 1 A Remove the bolts bag B Remove the parts shown below Parts that are used to bu...

Page 4: ...M60 Figure 2 SM60 main components 1 Cubes 2 2 Lat bench 2 3 Connecting beam 1 4 Lat tops 2 5 Tricep top 1 6 300 lb Weight stacks 3 7 190 lb Weight stacks 3 1 Place the two weight cubes in their final...

Page 5: ...gure 4 on both cubes using two 3 8 x 2 3 4 hex head bolts used to bolt the cross beam to the cross members and the adjustable pulley tops to the top beams Include the 3 8 flat washer end cap washers e...

Page 6: ...SM60 Unpacking Assembly Instructions 6 Figure 4 Bolt on the teardrop pulleys Figure 5 Configuration for 6 bolts...

Page 7: ...ove pulleys from housings to give clearance to socket extension Figure 7 Bolt on the connecting beam lat tops tricep tops 4 Mount the 56 lat tops part T to the cells using a 5 8 socket and combination...

Page 8: ...and the weight stacks 5 Install the weight stacks To do this A Using a 9 16 socket and combination wrench remove the tricep back rest bolts see Figure 9 B Using a 9 16 socket and combination wrench u...

Page 9: ...ft the weight stacks over the bottom plate and set the stacks onto the rubber bumpers with the plate numbers facing outward The 300 lb weight stack need to be facing the sides of the cells where the l...

Page 10: ...eight stack bayonet Make sure the 9 16 jam nut is threaded 1 5 8 away from the pulley as shown in Figure 12 Leave the pulleys out since you will need to have them out when the cable is routed Figure 1...

Page 11: ...SM60 Unpacking Assembly Instructions 11 Use a pinch bar to align the seat frame holes to the cubes Figure 13 Mount the benches to the frame Figure 14 Bolt locations on the frame...

Page 12: ...ver cables can be identified by the ball on the end of the cable The routings for these cables are shown in the figures below NOTE YOU MUST REMOVE ALL PULLEYS TO ROUTE THE CABLES USE A 9 16 COMBINATIO...

Page 13: ...ously route the two crossover cables as shown in Figure 16 Figure 16 Crossover cable routing Bolt the cable to the weight stacks as shown in Figure 17 Thread the 7 8 nut up on the cable bolt as shown...

Page 14: ...14 Figure 17 Screw the cable into the weight stack LAT PULLDOWN CABLE ROUTING Route the lat pulldown cable as shown in Figure 18 Screw the cable into the weight stack as shown previously in Figure 18...

Page 15: ...ing Assembly Instructions 15 TRICEP PUSHDOWN CABLE ROUTING Route the tricep pushdown cable as shown in Figure 19 Screw the cable into the weight stack as shown previously Figure 19 Tricep pushdown cab...

Page 16: ...SM60 Unpacking Assembly Instructions 16 HARDWARE 0 1 2 3 4 5 6 Hardware Figure 1 Assembly Parts...

Page 17: ...icep pushdown beams to the connecting beam F 3 8 x 2 3 4 hex head bolt used for all other connections G End caps bolt covers H 3 8 flat washer J 3 8 end cap washers end caps snap onto them K 3 8 Nyloc...

Page 18: ...ssembly Instructions 18 Hardware Figure 4 Top assemblies S Teardrop pulleys bolt on above lat pulldown 2 T 56 Lat tops bolt to top of cells with pulleys above lat benches 2 U 29 Tricep top bolt on to...

Page 19: ...y Instructions 19 Hardware Figure 5 Weight stack rubber bumpers W Weight stack rubber bumpers inserted under weight stacks Hardware Figure 6 Floating pulleys X Floating pulleys bolt to 190 lb cable cr...

Page 20: ...1 0017 00104 0363 0017 00104 0366 0017 00103 0233 6 bolt hardware A B C D 7 16 x 6 hex head bolt 7 16 flat washer 7 16 cap washer 7 16 Nyloc nut 8 8 8 8 0017 00101 1422 0017 00101 1408 0017 00042 0969...

Page 21: ...s 21 0017 00101 1413 0017 00104 0368 0017 00103 0217 Pulley hardware installed 1 3 4 Bolt Cap washer 3 8 Nyloc nut 0017 00101 1413 0017 00104 0313 0017 00103 0217 Floating pulley hardware installed 1...

Reviews: