26
GX
Step 8:
Assembly of the Lower Cable
1. Route the steel ball end of the lower cable (89) under pulley L1. Assemble pulley L1 at the front
of the low pull station by using one bolt (101) and one nylon nut (124).
2. Route the cable to pulley L2. Assemble pulley L2 to the base frame (1) by using one bolt (101)
and one nylon nut (124).
3. Route the cable underneath L2 and up to pulley L3. Assemble pulley L3 to the bottom of the
double pulley block (19) by using one bolt (101) and one nylon nut (124).
4. Route the cable down to pulley L4. Assemble pulley L4 to the base frame (1) by using one bolt
(101) and one nylon nut (124).
5. Route the cable underneath L4 and pulley L5. Assemble pulley L5 to the slot in the bottom of
the front upright (3) by using one bolt (99), two washers (116), two bushings (77), and one nylon
nut (124).
6. Connect the steel ball end of the cable to the receptor bracket L6 welded to the leg extension
arm (10).
Summary of Contents for Multi Gym GX
Page 2: ...2 GX...
Page 4: ...4 GX...
Page 10: ...10 GX...
Page 13: ...13...
Page 14: ...14 GX...
Page 20: ...20 GX...
Page 23: ...23...
Page 25: ...25...
Page 27: ...27...
Page 30: ...30 GX...
Page 43: ...43 7 3 Exploded Drawing...
Page 48: ...Multi Gym GX...