10
21
S T E P
Diagram 1
Cable Installation
WA R N I N G
!
!
Diagram 1A
Start by installing
pulley (A6).
Selector Rod Top Bolt (22) must be threaded a minumum
of 1/2” into the Selector Rod (21), and Jam Nut (25)
tightened securely against spring lock washer (24) to
ensure proper connection. Check the Jam Nut (25) once
a week to make sure it is tight.
Diagram 2
Pulley Installation
Lat
Pulldown
Cable
Summary of Contents for G3S
Page 1: ...Body Solid A s s e m b l y I n s t r u c t i o n s ...
Page 3: ...1 3 S T E P ...
Page 5: ...2 5 S T E P ...
Page 7: ...3 7 S T E P ...
Page 9: ...4 9 S T E P ...
Page 11: ...5 11 S T E P ...
Page 13: ...6 13 S T E P ...
Page 15: ...7 15 S T E P ...
Page 17: ...8 17 S T E P ...
Page 33: ...33 ...