9
Be careful to assemble all components
in the sequence they are presented.
mm
Inch
18
S T E P
Note:
All Pulleys in this step are 4 1/4” diameter, except where noted in step 8B.
Leave all pulley bolts hand tight until step 13 is completed.
A.
See diagram 1. Begin at the high pulley station. Route the metal ball end of the High Pulley Cable (66)
up and through the opening where Pulley (A1) will be installed and then down through the next
opening where Pulley (A2) will be installed.
B.
See diagram 2. Install 3 1/2” diameter Pulley (A1) under Cable (66) and into Top Frame (E) as shown
using:
One 43 (3/8” x 2 3/4” hex head bolt)
Two 15 (pulley spacer)
One 51 (3/8” nylon lock nut)
C.
See diagram 2. Install Pulley (A2) under Cable (66) and into Top Frame (E) as shown using:
One 44 (3/8” x 1 3/4” hex head bolt)
Two 55 (3/8” washer)
One 51 (3/8” nylon lock nut)
D.
See diagram 1. Route Cable (66) over the top and around pre-installed Pulley (A3) as shown.
Route Cable (66) around Pulley (A4) and install Pulley (A4) into Angled Vertical Frame (D) as shown in
diagram 2 using:
One 43 (3/8” x 2 3/4” hex head bolt)
Two 15 (pulley spacer)
One 51 (3/8” nylon lock nut)
E.
See diagram 1. Route Cable (66) between Pulley (A3) and pre-installed Pulley (A5).
Route Cable (66) over the top and around Pulley (A5) and back through Angled Vertical Frame (D).
Route Cable (66) down through the small arm sticking out of the Angled Vertical Frame (D).
And pull entire length of Cable through.
F.
See Diagram 3. Attach Seated Press Shroud (Z) to Seated Press Arm Support (P) using:
Four 73 (1/8” x 3/8” screw)
High Pulley Cable (66)
Ball Stop End
Metal Ball End
4270mm
14’
Summary of Contents for G3S
Page 1: ...Body Solid A s s e m b l y I n s t r u c t i o n s ...
Page 3: ...1 3 S T E P ...
Page 5: ...2 5 S T E P ...
Page 7: ...3 7 S T E P ...
Page 9: ...4 9 S T E P ...
Page 11: ...5 11 S T E P ...
Page 13: ...6 13 S T E P ...
Page 15: ...7 15 S T E P ...
Page 17: ...8 17 S T E P ...
Page 33: ...33 ...