
20
BA-102/2EN M54.XXXX
5.1 - Creating a setup plan
5 - Working with the assembly machine
5.1.1) Identifying drilling head and ruler
5.1.2) Removing setup plan template
• Fill out header data
Explanation of symbols:
5.1.3) Creating work piece drawings on the setup plan
• Make hand drawing on setup plan or copy drawing to setup plan
5.1.4) Drilling head setup for machine
• Add the colour description for the selected drilling head to the setup plan
• In the fields
Note:
To better understand the following description and procedures, take a
look at the included sample setup plan.
• In the overview on pages xx, xx and xx, select the required gear box and ruler
(8.2)
for the desired assembly application.
Enter parts description
Enter work procedure
Enter creation date
Enter comments
Enter page numbers
Enter number of pages
Drilling
Drilling and insertion
Check whether or not mode switch
(3.6)
is set to vertical drilling or vertical drilling and
fittings insertion.
8.2
!