Blue-White APNTU Quick Start Manual Download Page 5

INSTALLATION

Step-By-Step

1

Measure

Use the provided drawing dimensions to determine best mounting 

location of panel. 

Measure wall and locate mounting holes. Panels should be mounted 

at an elevation to allow for easy access to control unit.   

Wall Mount Weight: 45 lbs  

Install Strut

Use the provided strut and hardware to mount the panel.  

Strut to be mounted securely to wall using appropriate hardware. 

Strut spacing is on 15” centerline. 

If using provided anchor bolts, drill holes in concrete and clean 

thoroughly. Located strut and mount with appropriate tools. 

Check to make sure strut is secure and level.

2

4

Connect Electrical and Tubing

Use provided electrical diagram to connect power and 

communication wiring. 

Consult with electrical profession before performing any 

electrical work. 

Mount Panel

Mounting panel will requires 2 or 3 persons.

Mount panel to strut using provided hardware.  

Be sure panel is level before securing.  

Check spacing and panel before connecting electrical and piping.

 

3

5

Power Up System

Check all electrical connections before powering on system. 

Check piping connections for leaks. 

System is activated by pressing Power button on side of control panel. 

Summary of Contents for APNTU

Page 1: ...Quick Start Guide APNTU Turbidity Analyzer Panel...

Page 2: ...l time measurement display and data logging of Ultra Low Turbidity utilizing proprietary smart sensor technology coupled with a touch screen display and data logging terminal Reference the below dimen...

Page 3: ...trical Schematics Quick Start Guide Tools Needed Follow these instructions before installing your analyzer to avoid failure Read this guide and Instruction Manual before using CAUTION The APNTU is des...

Page 4: ...g to the outlet drain This is the sample water outlet flow This line must be diverted to drain Wall Mount Space The APNTU analyzer panel size is roughly 20 H x 36 W x 10 D in dimension Please accommod...

Page 5: ...e and clean thoroughly Located strut and mount with appropriate tools Check to make sure strut is secure and level 2 4 Connect Electrical and Tubing Use provided electrical diagram to connect power an...

Page 6: ...y necessary when changing parameter settings or performing calibrations To access this now press the icon and refer to Instruction Manual for more instructions regarding login and user management Real...

Page 7: ...U USB 1 x USB host for data downloading and screen upgrade Internet RJ 45 socket Modbus TCP Panel Operational Temperature 40 113o F 4 45 o C Storage Temperature Instrument 4 131o F 20 55o C Sensors 32...

Page 8: ...ssive heat or pressure or allowing the unit to support the weight of related piping BLUE WHITE does not assume responsibility for any loss damage or expense directly or indirectly related to or arisin...

Reviews: