![Blue-White APNTU Quick Start Manual Download Page 4](http://html1.mh-extra.com/html/blue-white/apntu/apntu_quick-start-manual_2776890004.webp)
Installation Requirements
Power Supply:
100~240VAC 50/60Hz
Water Supply:
Inlet water pressure should be from 7.25 – 30 psi (0.05-0.2MPa)
with an inlet feedwater line diameter of ¼-inch O.D. Tubing. The APNTU is pro-
vided with an inlet Rotameter and flow regulating valve for sample water inlet
flow control and limited pressure regulation. The range of inlet flow for the WR10
should be consistently maintained between 200 and 400 mL per minute.
Inlet Water: Connect the ¼-inch inlet water tubing to the quick adapter provided.
Consistent flow of 200-400mL is required.
Drainage:
The WR10 outlet tube (3/4” ID Tubing) located on the bottom of the
WR10, should be connected to a discharge drain via gravity flow.
Outlet Line:
Connect 3/4” ID tubing to the outlet drain. This is the sample water
outlet flow.
This line must be diverted to drain.
Wall Mount Space:
The APNTU analyzer panel size is roughly 20” H x 36” W
x 10” D in dimension. Please accommodate sufficient space for mounting. The
panel is equipped with pre-installed rear unistrut for simple wall mounting.
Wall Mount Weight:
Approximately 45 lbs (20kg). Please use appropriate
mounting hardware.
Wiring
The APNTU analyzer has universal AC power supply equipment allowing
users simply to plug the power supply into a 100~240V AC 50/60Hz power
outlet for normal operation.
The process of electrical connection to contact the 220V single-phase power
supply, should be operated by personnel with an electrician's license. Failure
to operate according to the electrical code of practice may result in electric
shock injury or even death.
Note: When in doubt regarding your electrical
installation, contact a licensed electrician.