Blue-White APNTU Quick Start Manual Download Page 3

IMPORTANT

Safety instructions

PRE-INSTALLATION

Before you begin

To access the wiring terminal, open the enclosure by 

loosening the four screws with the screwdriver. The 

Analyzer must be powered by 100~240VAC 50/60Hz. 

Communication wiring should be 20-24 AWG(American 

Wire Gauge) shielded cable. 

Planning

Ensure location of Analyzer complies with existing codes 

and regulations. Location of mounting must be strong 

enough to support weight of Analyzer and water. Analyzer 

and mounts are not designed to support any other 

structures, piping, or equipment.

Wiring

In the Box

• APNTU Analyzer Panel 

• Pre-Mounted Struts

• Pre-mounted Flow Meter

• Turbidity Sensor

• 1/4” tubing OD

• 3/4” tubing ID

• Concrete Anchors

• Electrical Schematics

• Quick Start Guide 

Tools Needed

Follow these instructions before installing your analyzer to avoid failure. Read 

this guide and Instruction Manual before using. 

CAUTION

The APNTU is designed to be installed and operated by qualified personnel only. 

Please note that warranty coverage does not include damage due to misuse or 

improper installation.

CAUTION

Always wear eye protection when using chemicals. 

CAUTION

Do not exceed maximum pressure. High pressure and temperature will damage 

the system. 

PRESSURE

Plumbing

Incoming water supply and drainage piping should 

be planned before installing the Analyzer. Additional 

components may be required to connect to the provided 

tubing.

Need more information.  Please contact customer service with questions. 

[email protected]   714-893-8529

Scan QR code to download 
full Instruction Manual. 

• 

Phillips Screwdriver

• 

Adjustable wrench

Summary of Contents for APNTU

Page 1: ...Quick Start Guide APNTU Turbidity Analyzer Panel...

Page 2: ...l time measurement display and data logging of Ultra Low Turbidity utilizing proprietary smart sensor technology coupled with a touch screen display and data logging terminal Reference the below dimen...

Page 3: ...trical Schematics Quick Start Guide Tools Needed Follow these instructions before installing your analyzer to avoid failure Read this guide and Instruction Manual before using CAUTION The APNTU is des...

Page 4: ...g to the outlet drain This is the sample water outlet flow This line must be diverted to drain Wall Mount Space The APNTU analyzer panel size is roughly 20 H x 36 W x 10 D in dimension Please accommod...

Page 5: ...e and clean thoroughly Located strut and mount with appropriate tools Check to make sure strut is secure and level 2 4 Connect Electrical and Tubing Use provided electrical diagram to connect power an...

Page 6: ...y necessary when changing parameter settings or performing calibrations To access this now press the icon and refer to Instruction Manual for more instructions regarding login and user management Real...

Page 7: ...U USB 1 x USB host for data downloading and screen upgrade Internet RJ 45 socket Modbus TCP Panel Operational Temperature 40 113o F 4 45 o C Storage Temperature Instrument 4 131o F 20 55o C Sensors 32...

Page 8: ...ssive heat or pressure or allowing the unit to support the weight of related piping BLUE WHITE does not assume responsibility for any loss damage or expense directly or indirectly related to or arisin...

Reviews: