background image

EXPLODED VIEW & PARTS LIST (continued) 

21 

ITEM  PART NO.  DESCRIPTION 

QTY 

(page 22) 

BREW DRAWER ASSY  

87136 

UPPER HOUSING, LEFT 

87175 

UPPER HOUSING, CENTER 

87137 

UPPER HOUSING, RIGHT 

86976 

COVER, TOP 

86975 

LOWER HOUSING 

86982 

BASE ASSY 

81732 

LEG, LEVELING 

 

CORD & CAP, NEMA 5-15P 

86618 

STRAIN RELIEF 

84382 

SWITCH, ON/OFF 

10 

84427 

SOLENOID SINGLE 1.0 GPM 

11 

85089 

SOLENOID ACCESS DOOR 

12 

86280 

THERMOSTAT (COTHERM) 

13 

86963 

PUMP, HOT WATER 12VDC 

14 

50198 

SWITCH, POD BIN 

15 

87196 

CONTROL BOARD 

16 

86969 

BRACKET, VALVE MOUNTING 

17 

83388 

VALVE, WATER OUTLET 

18 

8043-5 

STRAP, TANK HOLD-DOWN 

19 

8706-20 

VENT TUBE LONG 

20 

8043-83 

HI-LIMIT THERMOSTAT 

21 

87172 

TUBE, FILL 

22 

83521 

PROBE, WATER LEVEL 

23 

82390 

GROMMET, 3/8 

24 

83532 

SLEEVE, PROBE 

ITEM  PART NO.  DESCRIPTION 

QTY 

25 

86968 

TANK COVER 

26 

8043-12 

GASKET, TANK COVER 

27 

8043-14 

HEATING ELEMENT, 1500W 120V 

28 

8043-30 

SEAL, HEATING ELEMENT 

29 

8043-28 

NUT, 1/2-20 BRASS ELEMENT 

30 

86984 

WATER TANK ASSY 

31 

86962 

OVERLAY KEYPAD 

32 

8718-31 

LIGHT PILOT GREEN 120V 

33 

87193 

TUBING, STA-PURE 

34 

86959 

BYPASS SPOUT ASSY 

35 

87178 

LATCH MAGNETIC 

36 

86952 

POD DRAWER 

37 

86958 

CUP GRID 

38 

86895 

GRID, DRIP TRAY 

39 

86895 

DRIP TRAY 

40 

86964 

PUSH SWITCH, 120V HOT WATER 

41 

86967 

HOUSING, HOPPER 

HARDWARE NOT SHOWN 

42 

3-100 

SCREW 8-32x1/4 PH SS 

43 

87190 

SCREW #6 PH BLACK 

44 

86979 

SCREW 8-32x3/8 HI-LO PH SS 

14 

45 

83457 

NUT 8-32 HEX KEPS SS 

46 

 

 

 

47 

 

 

 

48 

 

 

 

49 

 

 

 

Summary of Contents for 9600 Single Cup

Page 1: ...TED IN CHINA 687 p n 77195 Rev ECN12792 M687 050207 cps Model 9600 Single Cup Brewer OWNERS MANUAL For COFFEE BREWERS MODELS 9600 SINGLE CUP INCLUDES Installation Operation Use Care Servicing Instruct...

Page 2: ...ffee carry a 90 days parts warranty only excludes decanters THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTY OF MERCHANTA...

Page 3: ...s the information needed to properly install this appliance and to use care for and maintain or repair the appliance in a manner which will ensure its optimum performance WARRANTY STATEMENT xi SPECIFI...

Page 4: ...FEATURES AND OPERATING CONTROLS AUTOMATIC BREWERS 2 Fig 1 Features Operating Controls for Single Cup Brewers...

Page 5: ...oducts for human consumption No other use is recommended or authorized by the manufacturer or its agents This appliance is intended for use in commercial establishments where all operators are familia...

Page 6: ...the counter to prevent tipping IMPORTANT To enable the installer to make a quality installation and to minimize installation time the following suggestions and tests should be done before the actual u...

Page 7: ...that must use a saddle tap shut off the main water supply and drill a 3 16 minimum tap for the saddle connection in order to insure an ample water supply Remember to flush the line prior to installin...

Page 8: ...d to protect you from electrical shock in the event of internal damage Never cut off the ground prong nor twist a blade to fit an existing receptacle Contact a licensed electrician to install the prop...

Page 9: ...illing When solenoid closes tank is full 2 Place an empty container on the cup grid Press the HOT WATER DISPENSE BUTTON and dispense one cup of water Tank should refill Discard water 3 Press TANK HEAT...

Page 10: ...beep sounds to enter the setting into memory OR For PULSE BREW a Press and release the key to start the water flow b Press and release the key again to stop the flow after the time desired for the fir...

Page 11: ...od holder by pulling the LOCKING LEVER fully forward 2 Pull the BREW TRAY fully forward This will automatically eject the used pod 3 Slide the tray fully to the rear In order to prevent an unintended...

Page 12: ...cloth moistened with clean water 6 Wash the pod drawer drip tray and cup grid in a sink using warm water and a mild detergent Rinse with clean water and allow to air dry 7 Wipe the exterior of the bre...

Page 13: ...OCKING LEVER fully forward 9 Pull the BREW TRAY fully forward to eject the sanitizer packet then slide it fully to the rear Gently pull the LOCKING LEVER DOWN then push it fully to the rear to lock th...

Page 14: ...Solenoid inlet strainer plugged Clean strainer Water filter if used plugged Replace filter element Damaged internal component or wiring Check wiring connectors inlet solenoid controller and water lev...

Page 15: ...NEL Remove top panel to access hot water tank thermostat heating elements brew pump and tubing brew solenoid hot water dispenser solenoid and piping pod holders and brew tray Top panel is held by scre...

Page 16: ...e to be performed by qualified technical personnel only NOTE Optimum brewing temperature range is 195 F to 205 F 90 C to 96 C IMPORTANT A mechanical thermostat will maintain temperature within 5 F To...

Page 17: ...t all wiring from heating element Remove tank ground wire Loosen nuts and center screw on tank hold down strap Remove hold down strap by sliding short slotted end off of locking stud and lifting it of...

Page 18: ...om turning while installing or removing the inlet water supply flare nut Remove fill tubing Disconnect wiring Remove two screws holding solenoid to access door Reassemble in reverse order CLEAN SOLENO...

Page 19: ...retaining screw and elbow fitting Be sure elbow fitting o ring and ring plate o ring are properly reinstalled after cleaning Clean all components using mild detergent and clean water Rinse with clean...

Page 20: ...orientation REPLACE CONTROLLER Disconnect brewer from electric power Remove top panel Note location of wire connections Be sure to mark the two keypad ribbon cables as to orientation Disconnect wirin...

Page 21: ...id assembly as described on page 15 3 Remove the water tank from the brewer body by lifting straight up Empty all water from the tank Set the tank back into the brewer 4 Mix 2 quarts of deliming solut...

Page 22: ...EXPLODED VIEW PARTS LIST 20 CABINET COMPONENTS...

Page 23: ...VENT TUBE LONG 1 20 8043 83 HI LIMIT THERMOSTAT 1 21 87172 TUBE FILL 1 22 83521 PROBE WATER LEVEL 1 23 82390 GROMMET 3 8 1 24 83532 SLEEVE PROBE 1 ITEM PART NO DESCRIPTION QTY 25 86968 TANK COVER 1 2...

Page 24: ...EXPLODED VIEW PARTS LIST 22 BREW TRAY COMPONENTS...

Page 25: ...SWING ARM LEFT 1 70 86851 SWING ARM RIGHT 1 71 86980 COTTER PIN 06Dx 5 SS 2 72 86977 PIVOT ROD 1 73 86974 BEARING THRUST 2 74 SPRING 1 75 86970 O RING 2 039 1 ITEM PART NO DESCRIPTION QTY 76 86846 RI...

Page 26: ...EXPLODED VIEW PARTS LIST continued 24 SERVICE PARTS KITS 84427 VALVE ASSEMBLY COMPLETE 85218 INLET FITTING KIT Includes cap fitting gasket strainer 85219 INLET STRAINER...

Page 27: ...25 WIRING DIAGRAM...

Page 28: ...n of Carrier Commercial Refrigeration In US and Canada Telephone 775 689 5700 Fax 888 492 2783 Fax 800 356 5142 website www wellsbloomfield com for orders only Bloomfield Industries proudly supports C...

Reviews: