background image

INSTALLATION INSTRUCTIONS (continued) 

IMPORTANT: 

Initial set-up must be performed 
by a qualified installer or 
qualified service technician. 
Improper set-up will damage the 
brewer and void the warranty. 

 
 
IMPORTANT: 

Complete water line installation 
before connecting brewer to 
electrical power. 

 
MAKE SURE THE FRONT 
PANEL "HEATER ON/OFF" 
SWITCH IS IN THE OFF
       
POSITION BEFORE           
CONNECTING BREWER TO 
ELECTRICAL POWER. 

 

DO NOT turn the HEATER ON/
OFF switch on until the water 
tank is filled.  Heating elements 
must be completely submerged 
in water at all times.  Damage to 
the brewer caused by operating 
the heating elements dry is NOT 
covered by warranty. 

 

 
 
 
 
 
 
NOTE:  Brewer will not operate 
unless the appropriate 
WARMER SWITCH is turned 

ON

 

INITIAL SET-UP INSTRUCTIONS 

 
Plumber’s and Electrician’s installation procedures must be 
completed before proceeding with the set-up. 
 
Be sure all electrical connections are secure, and that all 
plumbing connections are secure and leak-proof. 
 
 
1.  CHECK BREWER FOR PROPER CONFIGURATION 

 
       Make sure spray disk gaskets are in place INSIDE of spray 
       heads. 

 
       Make sure spray disks are properly installed. 

 
       Check hot water faucet for proper operation and leaks. 

 
       Place empty satellites in position. 
 
2.

START BREWER OPERATION 

 
       Be sure HEATER ON/OFF switch is 

OFF

, then press 

       POWER SWITCH on back of unit to energize brewer. 

 
       Water Inlet Solenoid will energize, filling the tank with water.  
       Fill time is approximately 13 minutes.  Tank will fill until water 
       is sensed at the water level probe.  Water level will be     
       maintained automatically once the tank is filled. 
 
       Press HEATER ON/OFF switch 

ON

.  Water in tank will heat 

       to brewing temperature in approximately 30 minutes.  When 
       the water temperature reaches the brew temperature set
       point, the READY-TO-BREW light will glow. 
 
3.    FINAL CHECKS 

 
       After initial heat-up and before brewing, draw water from the 
       hot water faucet until the inlet solenoid actuates.  This will 
       prevent volume differences to the initial brew caused by 
       water expansion. 

 
       Press SATELLITE WARMER switch on.  Brewer will not     
       operate unless the appropriate SATELLITE WARMER 
       switch on.   

 
 

Summary of Contents for 9220

Page 1: ...1 OWNERS MANUAL for SS2 SERIES DUAL SATELLITE COFFEE BREWERS with ELECTRO MECHANICAL CONTROL and EXTERNALLY HEATED SATELLITE SERVERS MODEL 9220 9221 Includes Installation Operation Use Care Servicing Instructions Model 9221 Dual Satellite Brewer ...

Page 2: ... coffee carry a 90 days parts warranty only excludes decanters THE FOREGOING OBLIGATION IS EXPRESSLY GIVEN IN LIEU OF ANY OTHER WARRANTIES EXPRESSED OR IMPLIED INCLUDING ANY IMPLIED WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE WHICH ARE HEREBY EXCLUDED BLOOMFIELD INDUSTRIES DIVISION SPECIALTY EQUIPMENT MANUFACTURING CORPORATION SHALL NOT BE LIABLE FOR INDIRECT INCIDENTAL OR CONS...

Page 3: ...in or repair the appliance in a manner which will ensure its optimum performance WARRANTY STATEMENT xi SPECIFICATIONS 1 FEATURES OPERATING CONTROLS 2 PRECAUTIONS GENERAL INFORMATION 4 AGENCY APPROVAL INFORMATION 4 INSTALLATION 5 OPERATION 7 CLEANING INSTRUCTIONS 10 PROGRAMMING INSTRUCTIONS 12 TROUBLESHOOTING SUGGESTIONS 17 SERVICING INSTRUCTIONS 18 EXPLODED VIEWS 20 WIRING DIAGRAM 24 SATELLITE 25 ...

Page 4: ...FEATURES AND OPERATING CONTROLS 2 Fig 1 SS 2 Satellite Brewing System Features Operating Controls ...

Page 5: ...acturer model and serial number Also lists voltage and wattage rating of brewer Glows when the tank water is up to temperature Located on lower right rear of brewer Turns main power to brewer ON or OFF Positions externally heated satellite on brewer Maintains temperature of product in satellite Control individual warmers for externally heated satellite Holds coffee grounds during brew cycle Forms ...

Page 6: ...or wiring Any procedure which requires the use of tools must be performed by a qualified technician This manual is considered to be a permanent part of the appliance This manual and all supplied instructions diagrams schematics parts breakdown illustrations notices and labels must remain with the appliance if it is sold or moved to another location This appliance is made in the USA Unless otherwis...

Page 7: ...r installations exceeding 12 Brewer must be connected to a COLD water line NOTE DO NOT use a saddle tap for this water line connection A shut off valve must be installed between the main water supply and the brewer Plumbing installer must supply the shut off valve A 1 4 turn ball valve is recommended Bloomfield highly recommends the use of the provided water strainer to help prevent deposits in th...

Page 8: ...ecure and leak proof 1 CHECK BREWER FOR PROPER CONFIGURATION Make sure spray disk gaskets are in place INSIDE of spray heads Make sure spray disks are properly installed Check hot water faucet for proper operation and leaks Place empty satellites in position 2 START BREWER OPERATION Be sure HEATER ON OFF switch is OFF then press POWER SWITCH on back of unit to energize brewer Water Inlet Solenoid ...

Page 9: ...at the gaskets are properly installed inside the spray heads Check the brew chambers Check that the brew chambers are clean Check that the bypass diverters are properly installed in the brew chambers START UP Press POWER SWITCH back of brewer to ON Brewer water tank will begin filling When tank stops filling press HEATER ON OFF switch to ON READY TO BREW light will glow when water is at proper tem...

Page 10: ...ne brew chamber under each brew head Insert Satellites Slide one satellite under each brew chamber until it is fully seated Press appropriate WARMER SWITCH to ON Select Brew Volume Press VOLUME SELECT switch to 1 GAL or 1 1 2 GAL Start the Brew Press either the right or left START BREW key NOTE The brew can be cancelled at any time by pressing the BREW STOP key At the end of the brew be sure all w...

Page 11: ... tee Bypass water flows through the brew basket but is diverted from the grounds by a bypass channel The remainder of the brew water is discharged through the SPRAY DISK and flows over the grounds in the brew basket Each half of the brewer is independently controlled HOT WATER FAUCET The HOT WATER FAUCET is fed by gravity from the hot water tank The faucet is spring loaded closed and manually open...

Page 12: ...e inside of spray head and area around spray head with a soft clean cloth or sponge moistened with clean water 6 Wash spray disks in a sink using warm water and a mild detergent A bristle brush may be used to clear clogged spray holes Rinse spray disks with clean water and allow to air dry 7 Wash brew baskets in a sink using warm water and a mild detergent A bristle brush may be used to clean arou...

Page 13: ...ard Then pull ears forward Lift guard off of retaining clip b Remove sight glass tube from silicone elbow Run the sight glass brush through the tube at least ten times c Reassemble the tube to the silicone elbow Be sure the elbow has not been pulled from the satellite body d Reinstall the sight glass guard 6 Reinstall lids Install satellites on brewer 7 Rinse satellites With an empty brew chamber ...

Page 14: ... panel then remove the tank lid assembly Do not disconnect the tank assembly at this time 3 Siphon all water from the hot water tank 4 Mix 10 gallons of deliming solution according to the manufacturer s directions Carefully pour the deliming solution into the water tank Lower the lid assembly back onto the tank Allow to sit for 30 minutes or as directed by the chemical manufacturer 5 At end of soa...

Page 15: ...pray disks 13 Reconnect brewer to electrical supply 14 Install the brew chamber without filter paper or grounds 15 Place an empty satellite under the brew chamber Run at least five 1 1 2 gallon brew cycles and discard all water generated at the end of each cycle Repeat for the other side 16 Rinse satellite with clean water Reinstall one empty satellite under each brew chamber Brewer is ready to us...

Page 16: ...r container to calibrate volume 1 Press HEATER ON OFF switch to OFF Turn POWER switch on back of brewer OFF 2 Remove TOP PANEL Operating controls are accessible through the top panel only 3 Adjust the TIMER setting NOTE Each side has its own timer The LEFT TIMER is for the LEFT SIDE the RIGHT TIMER is for the RIGHT SIDE Turn CLOCKWISE to increase time Turn COUNTER CLOCKWISE to decrease time Adjust...

Page 17: ... switch on back of brewer OFF 2 Remove TOP PANEL Operating controls are accessible through the top panel only 3 Remove one of the plugs in the tank cover and insert a thermometer of known accuracy 4 Locate the CONTROL THERMOSTAT on the right side of the top housing Turn CLOCKWISE to increase temperature Turn COUNTER CLOCKWISE to decrease temperature 1 8 turn is equal to approximately 10ºF change 5...

Page 18: ...s Too many paper filters or wrong filter used Use one genuine Bloomfield paper filter per brew Chamber discharge hole plugged Clean brew chamber Timer not set properly Set timer Too much coffee or too fine a grind Check with coffee supplier for recommended grind and quantity Heats slow Connected to wrong voltage Verify supply voltage Scale build up on heating elements De lime hot water tank Damage...

Page 19: ...ARD 1 4 86577 FAUCET SHANK ASSY 1 4 1 86600 FAUCET MODEL ESP 1 4 2 8700 25L SEAT CUP 3S10 1 4 3 84392 HANDLE 13SBE SNAP 1 4 4 84394 C RING 18 1 1 4 5 8600 26 NUT HEX 1 4 6 84395 SHANK 1 5 84299 HOUSING SIGHT GAUGE 1 6 84300 BRACKET SIGHT GAUGE 1 7 84354 TUBE SIGHT GAUGE 1 8 8043 13 ELBOW 1 9 SCREW 8A x 1 2 TRS HD ST BLK 4 10 SCREW 8A x 1 2 TRS HD ST SS 2 11 DECAL SATELLITE 1 4 7 84489 WASHER FIBRE...

Page 20: ...EXPLODED VIEW CABINET AND EXTERIOR COMPONENTS 18 ...

Page 21: ...P ON NONE ON 10A 2 23 82395 SWITCH LIGHTED 20A 250V 1 24 84098 SWITCH 2P 50A 1 25 LOWER HOUSING 1 26 COVER TOP HOUSING 1 27 FRONT PANEL 1 28 PLATE BOTTOM ASSY 1 29 BASE ASSY 1 30 84623 TIMER FULL 2 3 1 3 2 ITEM P N DESCRIPTION QTY 31 WELDMENT WARMER BASE 1 32 HOUSING UPPER ASSY 1 33 84382 SWITCH ROCKER HI TEMP 2 34 SCREW 8A x 1 2 TR TAP SS 40 35 82533 BREW CHAMBER ASSY SS O P T I O N A L 35a 82387...

Page 22: ...EXPLODED VIEW INTERIOR COMPONENTS 20 ...

Page 23: ...0º BEND 1 15 83312 THERMOSTAT HI LIMIT 2P 1 16 TANK LID ASSY 1 17 84630 TUBE SILICONE 50 ID x 4 25 2 18 8043 11 ELBOW OUTLET 2 19 83384 TUBE VENT EXTENSION 4 2 ITEM P N DESCRIPTION QTY 20 83537 TUBE SILICONE 9 1 21 83388 VALVE DISPENSING ADJUST 2 22 82148 LOCK WASHER 1 23 55485 NUT 1 4 20 pk 100 1 24 SCREW 8A x 1 2 TR TAP SS 4 25 86280 THERMOSTAT 15 CAP TUBE 1 26 83414 SHIELD HI LIMIT THERMO 1 27 ...

Page 24: ...22 WIRING DIAGRAM ...

Page 25: ...23 NOTES ...

Page 26: ...rier Commercial Refrigeration In US and Canada Telephone 775 689 5700 Fax 888 492 2783 Fax 800 356 5142 website www wellsbloomfield com for orders only Bloomfield Industries proudly supports CFESA Commercial Food Equipment Service Association ...

Reviews: