4
D
ES
C
R
IP
TI
O
N
C
OM
M
IS
S
ION
ING
INS
TA
LL
AT
ION
OP
ER
AT
ION
S
S
PA
R
E PA
R
TS
MAI
N
TE
N
AN
C
E
&
IN
SP
EC
TI
O
N
D
R
A
W
IN
G
S
TABLE OF CONTENTS
TA
B
LE
OF
C
ON
TE
N
TS
TABLE OF CONTENTS
4
DESCRIPTION 5
General Components
6
Motor 6
Hydraulics 6
Tank 6
Filters 6
Cooler/Heater
7
Explosion Proof Box
7
Specifications
7
Location of Identification Tag
7
Hydraulic Specifications
8
Shipping Data
8
COMMISSIONING 9
FloorHand Commissioning Procedure
11
Record of Training
13
INSTALLATION 14
Lifting
15
Electrical 15
Attaching the Hydraulic Lines
16
Filling the Reservoir
16
OPERATIONS 17
Start-up procedure
18
HPU will not power up.
20
HPU powers up, but will not build pressure.
21
MAINTENANCE & INSPECTION
22
Electric Motors
23
Reservoir 23
Filters 23
SPARE PARTS
24
Recommended Spare Parts for One Year Operation
25
Summary of Contents for 9PU-7200
Page 5: ...5 DESCRIPTION DESCRIPTION ...
Page 9: ...9 COMMISSIONING COMMISSIONING ...
Page 14: ...14 INSTALLATION INSTALLATION ...
Page 17: ...OPERATIONS 17 OPERATIONS ...
Page 22: ...MAINTENANCE INSPECTION 22 MAINTENANCE INSPECTION ...
Page 24: ...24 SPARE PARTS SPARE PARTS ...
Page 26: ...26 DRAWINGS DRAWINGS ...
Page 27: ...27 DRAWINGS Figure 9 ...
Page 28: ...28 DRAWINGS Figure 10 ...
Page 29: ...29 DRAWINGS Figure 11 ...
Page 30: ...30 DRAWINGS Figure 12 ...
Page 31: ...31 DRAWINGS Figure 13 ...
Page 32: ...32 DRAWINGS Figure 14 Figure 15 ...
Page 33: ...33 DRAWINGS Figure 16 ...