background image

6

OPERATION

Operating Instructions

OPERATION

When set to ON, your steamer has been factory set to 

maintain the generator standby temperature just below 

the boiling point, approximately 205 degrees Fahrenheit, 

in READY mode.

CONTROLS
Main Power Switch:

ON

Boiler will automatically fill with wa

-

ter and begin heating to STANDBY 

temperature.

OFF

The boiler will drain.

DELIME

Closes the drain valve while CLR 

liquid is being poured into the gen-

erator during the delime procedure.

Ready Light

When lit, indicates steam genera-

tor has reached 205 degrees Fahr-

enheit and is ready for the cooking 

cycle.

Cooking Light

When lit, indicates that a cooking 

cycle is in progress.

Timer

Set the cooking time (0 to 60 min-

utes) - steam cooking will begin 

when the door is closed. The cook-

ing cycle will be interrupted if the 

door is opened during the cook-

ing cycle; resume cooking by clos-

ing the door. When done, a buzzer 

sounds and steam stops being sup-

plied to the cooking chamber. Turn 

timer OFF to stop the buzzer.

PREHEAT

Turn the main power switch ON. When the ready light 

comes on, set the timer to 1 minute to preheat the com-

partment. This should be done when the steamer is first 

used for the day or whenever the chamber is cold. The 

door should be closed during the preheat cycle. COOK-

ING light is lit.
When the buzzer sounds, turn the timer to OFF. The 

steamer is now ready to cook.

COOK

After the preheat cycle, the READY light should be ON.
Place pans of food in the cooking chamber. Close the 

door.  Set  the  timer.  Steam  flows  into  the  compartment 

and the COOKING light is lit. Opening the door will inter-

rupt cooking; resume by closing the door.
At the end of the cooking cycle, the COOKING light goes 

off, the buzzer sounds and steam stops being supplied to 

the cooking chamber. To stop the buzzer, turn the timer 

to OFF.

SHUTDOWN

Turn the main power switch OFF – the boiler will auto-

matically blow down. Leave the compartment door open 

to allow the inside to dry out.
For an extended shutdown, turn the main power switch 

OFF, turn power and water supply OFF.

Each compartment is equipped with a removable 

drain screen. Frequently check the drain screen for 

accumulation of food particles. Should food particles 

accumulate against, or clog the drain screen, remove 

it, clean it thoroughly and then replace it in its original 

position.

Frequently check that the compartment drain and plumb-

ing is free of all obstructions. Never place food contain-

ers, food or food portion bags in the cooking compart-

ment in such a way that the compartment drain becomes 

obstructed.

CONSTANT STEAM FEATURE - OPTIONAL

A switch has been added to control this feature. It is locat-

ed below the timer under the heading “COOKING MODE”.

Operation for Timed Cooking

This switch must be positioned to the right, towards the 

heading “TIMED COOKING”. The operator then must se-

lect the time required for the cooking by setting the timer 

dial to the desired time from “0 to “60” minutes. At the end 

of the cook time an audible buzzer will sound.

Operation for Constant Steam

The switch must be positioned to the left towards the 

heading “CONTINUOUS COOKING”. This mode will pro-

vide continuous steam to the cooking chamber until the 

operator either turns the selector switch to the “TIMED 

COOKING” position, or turns the power switch to the 

“OFF” position.

SHUT DOWN

Turn timer dial to the “OFF” position. Turn main power 

switch to the “OFF” position.
For an extended shutdown, turn the main power switch 

off, turn power and water supply off.

Summary of Contents for SN-3E

Page 1: ...COUNTER CONVECTION STEAMER INSTALLATION OPERATION MAINTENANCE 42 Allen Martin Drive Essex Junction Vermont 05452 USA Telephone 802 658 6600 Fax 802 864 0183 www blodgett PN S00059 Rev E 8 18 2018 G S...

Page 2: ...Your Service Agency s Address Model Serial number Steamer installed by Installation checked by...

Page 3: ...o Not Come On 13 Unit Shuts Down While in Operation 13 IMPORTANT WARNING Improper installa tion adjustment alternation service or maintenance can cause property damage in jury or death Read the instal...

Page 4: ...IONS Drain 1 25mm IPS piped to open floor drain No solid connection 24 length before open air opening no bends or elbows Cold Water 3 8 10mm tubing at 25 50 PSI 170 345 kPa The drain piping must consi...

Page 5: ...optional 4 adjustable legs are used remove the four levelling feet on the bottom of the steamer FEET Levelling Feet standard or 4 Adjustable Legs Op tional Thread the four 2 levelling feet shipped in...

Page 6: ...ype drain Drain pipe should be copper DO NOT use PVC pipe PVC pipe may lose its rigidity or glue may fail Adjusting Screw Figure 3 WATER QUALITY The water supply connected to this steamer should con t...

Page 7: ...echanical connec tions have been made thoroughly test the steamer before operation 1 Check that proper water drain and electrical connec tions have been made 2 Turn main power switch ON After approxim...

Page 8: ...At the end of the cooking cycle the COOKING light goes off the buzzer sounds and steam stops being supplied to the cooking chamber To stop the buzzer turn the timer to OFF SHUTDOWN Turn the main power...

Page 9: ...lly thaw overnight in a refrigerator This will reduce their cooking time PREPARATION Prepare vegetables fruits meats seafood and poultry normally by cleaning separating cutting removing stems etc Cook...

Page 10: ...lid pan cover pasta with cold water Spaghetti Regular Vermicelli Macaroni Shells Elbows Noodles wide Lasagna Noodles 12 15 15 18 12 15 15 18 Frozen Casseroles Lasagna 35 Full Pan Meat Loaf 3 5 pounds...

Page 11: ...1 6 Cut 8 5 lb Carrots Baby Whole Frozen Crinkle Cut Frozen Sliced Fresh 8 7 8 11 7 lb 4 lb 9 lb Cauliflower Florets Frozen Fresh 6 7 8 6 7 8 Celery 1 Diagonal Cut 7 5 lb Corn Yellow Whole Kernel Fro...

Page 12: ...water with a cloth or sponge to clean exposed bead of door gasket rinse with warm clear water and wipe with a dry cloth 5 Wipe surfaces which touch door gasket with a cloth or sponge and warm soapy w...

Page 13: ...ces of lime that will not flush out drain Should the tank cover have to be removed check condi tion of sealing gasket before replacing cover The hold down bolts are to be tightened to 160 inch pound t...

Page 14: ...hrenheit just below water boiling point Howev er for high altitude locations an authorized servicer must adjust the steamer temperature lower To adjust 1 Remove side panel and turn control panel power...

Page 15: ...probes check visually and clean or chip off scalant Replace probe This problem is an indication of severe harmful water conditions which should be corrected immediately to avoid damage to the componen...

Reviews: