Installation
14
Initial Startup
NOTE: This procedure is for gas models only.
The following is a check-list to be completed by
qualified personnel prior to turning on the
appliance for the first time.
j
Remove the side panel.
j
Turn the manual shut-off valve, located on the
front of the oven, to the ON position.
j
Turn the mode switch to Cook, and set the
thermostat to 500
_
F (260
_
C).
With the main burner on, check the following.
j
Verify there are no gas leaks, by checking all
gas connections with a soapy water solution.
j
Verify that the manifold pressure is as recom-
mended. The manifold pressure can be
checked at the PRESSURE TAP located on
the burner manifold.
j
If the manifold pressure reading is set to the
recommended pressure requirements, allow
the oven to burn-off for 2 hours. If the pressure
reading is not set correctly, turn off the oven
and readjust accordingly.
WARNING
The break in procedure burns off excess
oils present in the metals during fabrica-
tion. Smoke may be produced. Proper
ventilation is required.
ADJUSTMENTS ASSOCIATED WITH INITIAL
INSTALLATION
Each oven, and its component parts, have been
thoroughly tested and inspected prior to ship-
ment. However, it is often necessary to further
test or adjust the oven as part of a normal and
proper installation. These adjustments are the
responsibility of the installer, or dealer. Since
these adjustments are not considered defects
in material or workmanship, they are not cov-
ered by the Original Equipment Warranty. They
include, but are not limited to:
D
D
D
D
calibration of the thermostat
D
D
D
D
adjustment of the doors
D
D
D
D
burner adjustments (gas ovens only)
D
D
D
D
leveling
D
D
D
D
testing of gas pressure (gas ovens only)
D
D
D
D
tightening of fasteners.
No installation should be considered complete
without proper inspection, and if necessary,
adjustment by qualified installation or service
personnel.