Installation
6
Oven Assembly
DOUBLE SECTION ASSEMBLY
1. Remove the two knock outs on the top of the
bottom oven.
2. Carefully lift the upper oven and place it on the
bottom oven.
3. With the side panel removed, align the holes
in the bottom of the top oven with the holes in
the top of the bottom oven.
4. Install the 1” long 1/2” bolt through the back
hole in the bottom oven into the nut welded
into the top oven.
5. Install the 1” by 1/2” bolt, 2 washers and nut
in the pass through hole as shown.
WARNING!!
DO NOT move stacked oven until the units
are secured together.
Figure 6
WARNING!!
When stacking gas ovens be sure to re-
move the single oven flue boxes prior to
attaching three-piece connector.
Flue
Connector
AC-500 gas oven stacking
Figure 7
OVEN LEVELING
After assembly, the oven should be leveled and
moved to the operating location.
1. The oven can be leveled by adjusting the feet
or casters located on the bottom of each leg.