Pentland Wholesale Ltd. Page
13
of
13
8.4
If the cabinet is excessively noisy, ensure that:
•
The frame or cabinet does not have any loose nuts, screws or bolts
•
The cabinet has been sited in a stable position and correctly levelled
9.
Spares/Repairs
Before commencing any service or maintenance work, isolate the cabinet from the
electrical supply. Always fit original spares which may be obtained from an
authorised supplier. If electrical supply cable needs to be renewed it must conform
to the original specification to that supplied with the cabinet. The engineer must
ensure that there is no possibility of water ingress or damp.
For replacement or extra parts, please scan the QR code below with your
smartphone or reader.
Alternatively, visit www.pentlandparts.co.uk
10.
Disposal
The scrapping of the cabinet should be undertaken by a suitable authorised
company working to local legislation and observing local statutes. The
composition of the cabinet is a follows:
The cabinet consists of:
•
Structure in steel plate
•
Electrical components and cables
•
Electrical compressor
•
Plastic materials
•
Refrigerant gas which must be discharged by a suitably qualified person
This manual has been compiled by