DC Control Power Supply
Heating Element Breakers
Heating Element Terminals
System Ground
Main System Power–
This panel requires a connection to an appropriate sized breaker. This needs to be installed before the connection point for the main power
cables are connected to the panel. Consult your local codes to determine if you need a main disconnect as well. In any case, we highly recommend a suitable
disconnect switch be installed prior to the panel for safe servicing of the panel. Your contractor will need to punch a hole in your panel for the main power cable
conduit in your desired location. Power demand for the brewhouse is 52A at 240V (single phase). Select a main breaker setting for 20% above the appropriate
amperage to avoid nuisance tripping or as directed by your local codes.
Heating Element Grounds
System Power
BK
Elements
Float Switch and
RTD Terminals
SINGLE PHASE