2 BBL Hybrid™ 2 Vessel Brewhouse V2
© Blichmann Engineering, LLC 2019
For replacement parts, visit: blichmannengineering.com/genuine-replacement-parts
2
ASSEMBLY
Assemble the kettle stands as shown in the images below.
Place stands in the desired location Use a level to ensure that the stand arms are level. Adjust the leveling feet as needed. It is recommended that you allow
enough clearance between kettles and also on the sides and rear to allow personnel access for cleaning and service of the ancillary equipment. Although in
practical use, the kettles can easily be slid out for any service needs.
Install valves and fittings as shown in the images below. Note that a 6” spool is added to the mash tun drain to allow the valve to swing under the stand so that a
spent grain tote can be placed under the manway. It is not necessary to add the spool to the BK.
SPOOL FOR MASH TUN ONLY
KETTLE PLACEMENT & FITTINGS INSTALLATION
Whirlpool
Whirlpool
CIP/Sparge Ball
Manway
Heating
Elements
Heating
Elements
Bottom
Dump
Bottom
Dump