– 44 –
C
HAPTER
3
| Installing the Switch
Mounting
M
OUNTING
The switch can be mounted in a standard 19-inch equipment rack or on a
desktop or shelf. Mounting instructions for each type of site follow.
R
ACK
M
OUNTING
Before rack mounting the switch, pay particular attention to the following
factors:
◆
Temperature: Since the temperature within a rack assembly may be higher
than the ambient room temperature, check that the rack-environment
temperature is within the specified operating temperature range. (See
page 78
.)
◆
Mechanical Loading: Do not place any equipment on top of a rack-mounted
unit.
◆
Circuit Overloading: Be sure that the supply circuit to the rack assembly is
not overloaded.
◆
Grounding: Rack-mounted equipment should be properly grounded.
Particular attention should be given to supply connections other than direct
connections to the mains.
To rack-mount devices:
1.
Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.
Summary of Contents for LGS103AE
Page 2: ......
Page 3: ......
Page 5: ......
Page 15: ...14 COMPLIANCES AND SAFETY STATEMENTS...
Page 21: ...20 TABLES...
Page 23: ...22 FIGURES...
Page 33: ...32 CHAPTER 1 Introduction Features and Benefits...
Page 41: ...40 CHAPTER 2 Network Planning Application Notes...
Page 55: ...54 CHAPTER 3 Installing the Switch Connecting to the Console Port...
Page 89: ...88 GLOSSARY...
Page 92: ......
Page 93: ...LGS103AE LGS104AE...
Page 94: ......