– 43 –
C
HAPTER
3
| Installing the Switch
Equipment Checklist
E
QUIPMENT
C
HECKLIST
After unpacking this switch, check the contents to be sure you have received all
the components. Then, before beginning the installation, be sure you have all
other necessary installation equipment.
P
ACKAGE
C
ONTENTS
◆
24- or 48-port Gigabit Ethernet Switch (LGS103AE or LGS104AE)
◆
Four adhesive foot pads
◆
Bracket Mounting Kit containing two brackets and eight screws for attaching
the brackets to the switch
◆
Power cord—either US, Continental Europe or UK
◆
Console cable (RJ-45 to RS-232)
◆
This Installation Guide
◆
Management Guide CD
O
PTIONAL
R
ACK
-M
OUNTING
E
QUIPMENT
If you plan to rack-mount the switch, be sure to have the following equipment
available:
◆
Four mounting screws for each device you plan to install in a rack—these
are not included
◆
A screwdriver (Phillips or flathead, depending on the type of screws used)
Summary of Contents for LGS103AE
Page 2: ......
Page 3: ......
Page 5: ......
Page 15: ...14 COMPLIANCES AND SAFETY STATEMENTS...
Page 21: ...20 TABLES...
Page 23: ...22 FIGURES...
Page 33: ...32 CHAPTER 1 Introduction Features and Benefits...
Page 41: ...40 CHAPTER 2 Network Planning Application Notes...
Page 55: ...54 CHAPTER 3 Installing the Switch Connecting to the Console Port...
Page 89: ...88 GLOSSARY...
Page 92: ......
Page 93: ...LGS103AE LGS104AE...
Page 94: ......