should manually replace the failed link or unit as soon as possible. If you are
using a wrap-around stack topology, a single point of failure in the stack will not
cause the stack to fail. It would take two or more points of failure to break the
stack apart.
If the Master unit fails or is powered off, the backup unit will take control of the
stack without any loss of configuration settings. The Slave unit with the lowest
MAC address is selected as the backup unit.
C
ONNECTING TO A
P
OWER
S
OURCE
To connect a switch to a power source:
1.
Insert the power cable plug directly into the AC socket located at the back of
the switch.
Figure 19: Power Socket
2.
Plug the other end of the cable into a grounded, 3-pin, AC power source.
N
OTE
:
For International use, you may need to change the AC line
cord. You must use a line cord set that has been approved for the
socket type in your country.
3.
Check the front-panel LEDs as the device is powered on to be sure the PWR
LED is lit. If not, check that the power cable is correctly plugged in.
Summary of Contents for LGS103AE
Page 2: ......
Page 3: ......
Page 5: ......
Page 15: ...14 COMPLIANCES AND SAFETY STATEMENTS...
Page 21: ...20 TABLES...
Page 23: ...22 FIGURES...
Page 33: ...32 CHAPTER 1 Introduction Features and Benefits...
Page 41: ...40 CHAPTER 2 Network Planning Application Notes...
Page 55: ...54 CHAPTER 3 Installing the Switch Connecting to the Console Port...
Page 89: ...88 GLOSSARY...
Page 92: ......
Page 93: ...LGS103AE LGS104AE...
Page 94: ......