INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Bisolid GP xx_B hc> . OM-BSGPHCV02/07/2017/EN
13
4. PELLET BURNER INITIALIZATION FOR OPERATION
4.1. PELLET BURNER CHECK-UPS BEFORE INITIALIZATION FOR
OPERATION
Before initializing the pellet burner for operation the servicing technician must check:
If the pellet burner series Bisolid GP xx_B hc> is going to be installed on a solid fuel
Bisolid hot water boiler.
If the installation, including the hot water boiler, complies with the project.
If the wood pellets correspond to standard EN ISO 17225-2:2014, class A1.
Electrical supply functionality and working order.
The service technician must train the consumer how to operate and manage
the pellet burner and also to fill in the exact start of operation date in the
warranty card of the product.
4.2. JOINT OPERATION OF PELLET BURNER AND SOLID FUEL
BOILER
The pellet burner series Bisolid GP xx_B hc> is allowed for installation only to hot water
boilers approved by its manufacturer.
The possibility for parallel operation of solid fuel hot water boiler with automated pellet burner
from series Bisolid GP xx_B hc> is based on the fact that the burner manufacturer has
performed multifunctional and precise tests and measurements over the pellet burner
operation with certain type of hot water boilers. Assembly of the pellet burner to a hot water
boiler must be performed with the appropriate installation kit.
The pellet burner’s series Bisolid xx_B hc> can be mounted to the hot water
solid fuel boilers with sufficiently high efficiency.