A. INSTALLATION GUIDE > 3. INSTALLATION LAYOUTS
PAGE
10 / 51
Installation and User guide – ECOROCK - Systems – 26-05-2016
3.
Installation layouts
The installation of the BIOROCK® system depends on the available site, gradient, type of ground, the
level of the water inlet and the discharge options.
When the outlet for final effluent is not accessible, a sampling shaft should be installed.
When using a final effluent pump the pump shaft can be used as a sampling shaft.
3.1 INSTALLATION LAYOUT N°1
GRAVITY DISCHARGE (non-electric)
3.2 INSTALLATION LAYOUT N°2
PUMPED DISCHARGE, PUMP AFTER THE PRIMARY TANK
3.3 INSTALLATION LAYOUT N°3
PUMPED DISCHARGE, PUMP AFTER THE ECOROCK® TREATMENT UNIT
PRIMARY TANK
ECOROCK
TREATMENT UNIT
OPTIONAL
SAMPLING PIPE
DISCHARGE
PRIMARY
TANK
INTERMEDIATE
PUMPING WELL
ECOROCK
TREATMENT
UNIT
OPTIONAL
SAMPLING
PIPE
DISCHARGE
PRIMARY TANK
ECOROCK
TREATMENT UNIT
PUMPING &
SAMPLING PIPE
DISCHARGE