A. INSTALLATION GUIDE > 6. STOPPING AND RE-STARTING THE SYSTEM
PAGE
21 / 51
Installation and User guide – ECOROCK - Systems – 26-05-2016
6.
STOPPING AND RESTARTING THE SYSTEM
The establishment of an efficient biomass varies. The system start-up period differs depending on the
system size, its location, the temperature and especially the conditions of use.
For long periods of shutdown or non-use of the system (absence periods), no special precautions are
required. The sewage system will re-start as facilities are used again and will not require any
particular attention.
For absence periods exceeding six months, it is recommended to empty the Primary Tank and refill
with fresh water.
If the unit is equipped with an electric ventilator, it is best to shut it down during the absence period
and to check and clean it before the restart.
If a pump station is installed, it is best to commission it and clean it before the shutdown period.
The BIOROCK® system remains efficient after a shutdown period.
7.
CONFORMITY AND WORK COMPLETION
In all cases, the owner and the installer will jointly complete the installation checklist for BIOROCK®
Sewage Treatment Plants (Appendix 5) and send it back to the manufacturer at the address listed.
The document is attached to the user's guide. This completed document validates the warranty when
received by the manufacturer.
8.
RECOMMENDATIONS FOR USE AND MAINTENANCE
See the procedures in Part B of this Manual; User Guide, page 23-47.
9.
COMPLIANCE WITH REGULATIONS AND STANDARDS
The ECOROCK-5000 units comply with all requirements of EN 12566-3 + A2, 12566-6 and the
Construction Product Regulations.
Performance tests for the CE marking of BIOROCK® units were produced and validated by the
European Platform notified as CERTIPRO (notification NB 1476) located in MOL, Belgium.